
Configuration Setup
11
The RCL programming procedure consists of the following steps:
setting the boom type configuration
setting the counterweight configuration
setting lower configuration
specify boom / setting the hoist configuration and reevings
selecting the pick point
confirmation of the programming procedure
For easy operation, the computer guides the operator through the procedure step by step.
(interactive operation)
Definition of the Displayed Symbols:
The following illustrations define the symbols appearing on the display during the setup
procedure for your crane. Not all symbols will be shown, depending on the crane model and the
answers to the questions.
Setting the boom type configuration
Symbol description.
main boom operation
jib operation
main boom
tip extension
jib
Содержание DS 350 / 1334 GRAPHIC
Страница 2: ......
Страница 13: ...System Description 1 0 is deactivated...
Страница 51: ...REV DATE NAME DESCRIPTION 09 15 00 CSH HC238 graphic operator s manual created MANUAL REVISIONS...