16
Legal Requirements
Hunter Stoves Group requests that before installation and/or use of this appliance that you read these instructions
carefully to ensure that all the relevant requirements are fully understood.
These instructions cover the basic principles to ensure satisfactory installation of the stove, although details may
need slight modification to suit particular local site conditions. In all cases the installation must comply with current
Building Regulations, Local Authority Byelaws, European and National Standards and other specifications or
regulations as they affect the installation of the stove. It should be noted that the Building Regulations requirements
may be met by adopting the relevant recommendations given in British Standards BS 8303, BS 6461 and BS 7566 as
an alternative means to achieve an equivalent level of performance to that obtained following the guidance given in
Approved Document J.
Your local Building Control Officer can advise you regarding the interpretation of the Regulations should there be any
questions.
This appliance must be installed by a Registered Installer (see Competent Persons Scheme) or approved by your local
Building Control Officer.
All works undertaken must be carried out with due care and attention to meet the requirements of the Health &
Safety code of practice and any other legislation that may have been introduced since the publication of these
instructions.
Competent Persons Scheme
Members of the following schemes may self-certify the installation of this stove. If the installer is not a member of
one of these schemes, your local Building Control Department must approve the installation.
Scheme
Web address
Telephone
APHC (Association of Plumbing and Heating
Contractors (Certification) Limited
02476 470 626
Building Engineering Services Competence
Accreditation (BESCA Limited)
0800 652 5533
HETAS Ltd (Heating Equipment Testing and
Approval Scheme)
01462 634721
NAPIT Registration Ltd
0870 444 1392
NICEIC Group Ltd
0800 013 0900
Air Supply
Aspects 4, 4C, 5, 5C, 6 and 7
The room or space containing this appliance does not need a permanent, unobstructed air opening unless the air
permeability rating is less than or equal to 5m³/hour/m².
Aspects 8, 9, 14
The room or space containing this appliance does need a permanent, unobstructed air opening (see Technical
Specifications).
All
If a draught stabiliser is fitted, the air opening should be at least: -
1470mm² (Aspect 4s, 5s)
4165mm² (Aspect 5, 8 Slimline, 6, 7)
2350mm² (Aspect 8)
4050mm² (Aspect 9)
5325mm² (Aspect 14).
Due consideration should be given to air requirements for any other appliance in the same room or space.
Any air opening must be kept clear from blockage or obstruction.
Содержание ASPECT 4/4 COMPACT
Страница 13: ...13 Dimensions Aspect 6 Dimensions Aspect 7 Dimensions Aspect 8 Slimline...
Страница 14: ...14 Dimensions Aspect 8 Dimensions Aspect 9 Dimensions Aspect 14...
Страница 31: ...31 BODY ASSEMBLY SPARES ASPECT COMPACT 5 AND 5 BODY ASSEMBLY SPARES ASPECT 5 SLIMLINE...
Страница 32: ...32 BODY ASSEMBLY SPARES ASPECT 6 BODY ASSEMBLY SPARES ASPECT 7...
Страница 33: ...33 BODY ASSEMBLY SPARES ASPECT 8 BODY ASSEMBLY SPARES ASPECT 8 SLIMLINE...
Страница 34: ...34 BODY ASSEMBLY SPARES ASPECT 9 BODY ASSEMBLY SPARES ASPECT 14...