3.
1.
2.
4.
Lifting Point
Catch Post
45 mins
60 5
10
15
20
25
30
35
40
45
50
55
in
Parking and access control equipment manufactured in the UK
Manual Sliding Gates
Component Identification & Notes
5
1.
When delivered, the gate is locked in a central position so that the gate is
balanced when lifted from the top of the tower.
2.
Lower the gate onto the plinth and visually align the gate and catch-post into position. Using one M20
fixing, bolt down the main tower using one of the rear bolt-down holes.
3.
Making sure that the gate is still visually aligned, use one M16 fixing and bolt down the rear support
wheels (on the opposite side to the hole used on the main tower) see below.
4.
Manually slide the gate into the closed position to fine tune the alignment of the gate with the catch
post.(See Page 6 for details on Manual Release)
The numbers in the text document below relate to the drawings below.
You should check that you have received the following in your order as they are referred to throughout this
manual (note this can change per gate spec i.e. manual components are different from automatic):
M16 Anchor
Catch Post
Bolt 4 No.
M16 Bolt
8 No.
M20 Bolt
4 No.
PF9000 A/M
PF9000 A/M
M
anual Sliding Gate
M
anual Sliding Gate
Maximum Span: 10 Metres
Duty Cycle: 100%
GB
O&M Manual
Revision
8.3
O&M Manual 1 No.
Catch post 1 No.
Bottom catch
post bracket 1 No.
Rear external
roller 1 No.
Top catch post
bracket 1 No.