in
Parking and access control equipment manufactured in the UK
Manual Sliding Gates
11
System Operation - The user FULLY understands
YES
NO
How to operate the system
The safety rules and issues associated with your system
Safety devices and features suit the site/application for which it was designed
How to open the door on the equipment
Check the following items
YES
NO
Door keys have been handed over
All equipment and site has been left in a clean and safe state
Any warning signage has been fitted by Engineer/Client to make people aware
Any times and special programming instructions undertaken
System has had the completed conformity certificate
All items on the delivery note have been handed over to client/site -
this should be signed for on the separate sheet which is titled “Delivery Note” (green/ or yellow paper) if parts missing call supplier
The engineer has expressed the importance of regularly maintaining the equipment
.....................................................................................................................................................
Installation & Commissioning Check List
The following denotes that the above has been completed to a satisfactory standard. The engineer has explained the system of
operation to you and any devices that you have had fitted. If this is agreed and has been displayed please sign in the indicated
fields below. All information will be passed on correctly to other system users. The users of the system will use this system
correctly and safely.
Engineers Name: ........................................................................ Engineers Signature: ...........................................
Clients Name: ............................................................................. Clients Signature: .................................................