background image

in

Parking and access control equipment manufactured in the UK

Manual Sliding Gates

11

System Operation - The user FULLY understands

YES

NO

How to operate the system 

The safety rules and issues associated with your system

Safety devices and features suit the site/application for which it was designed

How to open the door on the equipment

Check the following items

YES

NO

Door keys have been handed over

All equipment and site has been left in a clean and safe state

Any warning signage has been fitted by Engineer/Client to make people aware

Any times and special programming instructions undertaken

System has had the completed conformity certificate

All items on the delivery note have been handed over to client/site - 

this should be signed for on the separate sheet which is titled “Delivery Note” (green/ or yellow paper) if parts missing call supplier

The engineer has expressed the importance of regularly maintaining the equipment

.....................................................................................................................................................

Installation & Commissioning Check List

The following denotes that the above has been completed to a satisfactory standard. The engineer has explained the system of 
operation to you and any devices that you have had fitted. If this is agreed and has been displayed please sign in the indicated 
fields below. All information will be passed on correctly to other system users. The users of the system will use this system 
correctly and safely. 

Engineers Name: ........................................................................      Engineers Signature: ...........................................

Clients Name: .............................................................................      Clients Signature: .................................................

Содержание PF9000

Страница 1: ...ntrol equipment manufactured in the UK PF9000 Manual Sliding Gate Rev 8 3 Manual Barriers Auto Sliding Gates Auto Bi Fold barriers Auto Rising Kerbs Turnstiles Auto Rising Bollards Installation Operation Maintenance Manual ...

Страница 2: ...05 06 07 08 11 14 12 INDEX HEALTH SAFETY INFORMATION DELIVERY MOVEMENT TRANSPORT COMPONENT IDENTIFICATION BULLET LOCK GUIDE OPEN CLOSE LOCK SEQUENCE POTENTIAL SYSTEM HAZARD AREAS HANDING FORM INSTALL COMMISSIONING CHECK LIST SERVICE LOG COMMISSIONING CERTIFICATE DECLARATION OF CONFORMITY 13 2 09 10 ...

Страница 3: ...ries the abovementioned standards as well as the current national standards should be respected in order to achieve a good safety level Information on using this manual Ÿ Read all information thoroughly Ÿ Pay attention to all safety advice Ÿ Be aware of the symbols shown above right and above left as they have different meanings One is an information symbol the other a warning Ÿ There are many arti...

Страница 4: ...thorities LA working in partnership The project aims to reduce injuries and ill health arising from the movement of goods from supplier through haulier to the recipient and end user including any home deliveries The project will focus upon the delivery and collection of goods and the hazards this generates It covers the main areas that cause the majority of injuries and ill health to workers inclu...

Страница 5: ... wheels on the opposite side to the hole used on the main tower see below 4 Manually slide the gate into the closed position to fine tune the alignment of the gate with the catch post See Page 6 for details on Manual Release The numbers in the text document below relate to the drawings below You should check that you have received the following in your order as they are referred to throughout this ...

Страница 6: ...in an unstressed state 9 Placing a level on the centre of the lower beam or lower rail adjust the rear wheel support until the lower main beam is level Manually pull the gate closed and adjust the cantilever until the gate is level 10 Using a laser square or similar make sure the photo cells from the Main Gate Housing to the Catch Post line up this should be already level as it is governed by the ...

Страница 7: ...d If you have any questions please call our technical department The catch post has been fitted with a housing that the above bullet lock fits into On first fitting when the gate is fully open and closed you will need to drill a 12mm hole in the lower gate main beam to receive the end pin of the bullet lock above You will drill straight through dead centre of this to ensure correct alignment When thes...

Страница 8: ...injury and or damage to the gate 8 Opening 1 Unlock the gate 2 Twist the handle clockwise to allow the catch bolt to clear the keep 3 Walk the gate to the fully open position ensuring there are no obstacles blocking its path 4 Insert the Bullet Lock into the post locking the gate open 1 Remove the Bullet Lock from the post 2 Walk the gate to the fully closed position ensuring there are no obstacle...

Страница 9: ...ential Hazard Areas see diagram 1 2 3 4 5 Additional Comments Descriptions concerning safety on this site Signed Potential System Hazard Areas Please note these are things that you should look out for with the equipment that has been installed on your your customers site This is in no way a health and safety guide just a few key areas for you to be aware of and possibly make future changes to ...

Страница 10: ...span of the clear opening Gate length mm PF Quote Refrence Your Order Number Customer Contact No Section 4 b Additional Information Use a separate sheet if necessary Section 4 a Delivery or Install Address Todays Date Required Delivery Date Height of Gate required Spikes Required yes or no Type of Infill Required Section 3 Gate Handing Choice I require a LEFT handed gate shown above I require a RIG...

Страница 11: ... the completed conformity certificate All items on the delivery note have been handed over to client site this should be signed for on the separate sheet which is titled Delivery Note green or yellow paper if parts missing call supplier The engineer has expressed the importance of regularly maintaining the equipment Installation Commissioning Check List The following denotes that the above has been...

Страница 12: ...0 20 20 This Manual must be completed in accordance with the guidelines below at any point service repair work is carried out on the product This is to achieve two things 1 To keep a history of the product for yourself and your supplier manufacturer 2 To keep an accurate log of any historical or recent modifications and or problems to help an engineer in the event of any future work required on the...

Страница 13: ...installed in accordance with the following documents Document Ref Revision Description PF9000A M 5 0 System guides and drawings as defined within O M Manuals Part 4 The following test procedures refer Check Lists pages 15 16 Commissioning Certificate Part 5 Existing Installation Items not covered under warranty This certificate Installers Name On Behalf of Address Signature Date of Signing Position P...

Страница 14: ...sential Health and Safety requirements of the Machinery Directive 2006 42 EC and the following transposed harmonised standards BS EN 292 Parts 1 2 1991 BS EN 60204 Part 1 1993 BS EN 294 1992 BS EN 249 1993 BS EN 418 1992 and BSEN13241 1 including other standards BS EN 12445 2008 BS EN 12453 2008 We hereby certify that the machinery stipulated below complies with all relevant provisions of the EC M...

Страница 15: ...RONMENT NOXIOUS MATERIALS EUROPEAN MARK CERTIFYING CONFORMITY TO THE ESSENTIAL REQUIREMENTS OF THE STANDARDS 2006 42 EC Proudly Proudly Made Made in the UK in the UK Proudly Made Made using recycled paper The manufacturer reserves the right to make amendments to this manual without prior notice and declines all responsibility for any errors personal injury or damage to property ...

Отзывы: