background image

Bulletin TI-FID1000C 

FID 1000 and 2500 Gas Stations

Parker Hannifin Corporation

Filtration and Separation Division

Haverhill, MA • 1-800-343-4048 

www.parker.com/ags

2

Regulatory Compliance

Installation and Operation

The FID Gas Stations are certified to the electrical safety requirements as specified by the 

IEC, CSA, and UL standards.  These units bear both the CSA and UL markings on the product 

label.  Products supplied to Europe carry the CE mark (220, 230, 240 VAC units only).  The 

generator meets EMC compliance.

Zero Air System

 

The Parker Balston FID Gas Station includes all of the components necessary to purify 

compressed air into zero-grade hydrocarbon-free air.  The generator comprises three primary 

functional groups: prefiltration, hydrocarbon removal and final filtration (see Figure 2).  

A high efficiency coalescing filter has been incorporated into the design of the Parker Balston 

FID 1000 and FID 2500 as a prefilter to remove oil, water, and particulate contamination from 

the incoming compressed air supply. The prefilter assembly is equipped with an solenoid 

autodrain to eliminate any liquids which have accumulated within the filter housing.  The sole-

noid  drain opens to dump condensate once per hour for 1 second.  If the condensate capacity 

exceeds the volume of the filter housing, condensate can be carried into the catalyst module.  

Refer to the compressed air utility section to eliminate this occurance.

The catalyst module is a stainless steel housing filled with propietary catalyst and assembled 

with a heater.  The catalyst module oxidizes hydrocarbons from the compressed air supply into 

carbon dioxide and water.  The module is sized to deliver 1000 cc/min or 2500 cc/min of zero-

grade hydrocarbon-free air to the instrumentation downstream.

The final filter on the Parker Balston FID Gas Station is a high efficiency sintered metal filter 

which removes particulate contamination to 0.5 micron.  This final filter ensures that the outlet 
air from the Parker Balston Gas Station is particle-free.  

  

Prefiltration

Hydrocarbon Removal

Final Filtration

Figure 2  - Flow Schematic Zero Air

Содержание Balston FID 1000

Страница 1: ...source of hydrocarbon free air This will purify on site compressed air to a total hydrocarbon concentration of less than 0 1 ppm measured as methane The ZAG may be used to generate fuel for Flame Ioni...

Страница 2: ...and particulate contamination from the incoming compressed air supply The pre lter assembly is equipped with an solenoid autodrain to eliminate any liquids which have accumulated within the lter hous...

Страница 3: ...urs inside the electrochemical cell assembly Figure 3 Positively charged hydrogen ions are transported across the solid polymer electrolyte along with excess water molecules The hydrogen ions then rec...

Страница 4: ...ould be located in close proximity to the electrical power supply and the downstream equipment to which it supplies both Hydrogen and Zero grade air There is no limit to the distance between the gener...

Страница 5: ...cal power supply voltage Note NA versions of the generator are designed for 120 VAC operation only Deionized Water The FID 1000 and FID 2500 hydrogen must be supplied with deionized water with a resis...

Страница 6: ...d is located at the top center of the rear panel Inlet tubing and ttings should be clean and rated for 125 psig 8 5 Barg minimally The tubing and ttings used downstream from the FID 1000 and FID 2500...

Страница 7: ...iltration and Separation Division Haverhill MA 1 800 343 4048 www parker com ags 7 Figure 6 Unscrew desiccant cap Figure 7 Insert new desiccant cartridge Figure 8 Press down rmly on desiccant to seat...

Страница 8: ...ly The FID Gas Station H2 must be supplied with deionized water with a resistivity of at least 5 Meg Ohm cm or greater Both a Gravity Feed and a Pressure Feed Tubing assembly can be located in the Acc...

Страница 9: ...he device until the desired water level is visible through the Front Panel Display Replace the cap and close the side cover lid It will take approximately 2 liters of deionized water to ll the generat...

Страница 10: ...er in the reservoir above the REFILL line at all times or ensure that the FID Auto ll is directly connected to a DIO water source 2 Minimize the dead volume in the piping between the generator and the...

Страница 11: ...carbons HYDROGEN Over ow in Use 0 0 0 psi ZERO AIR At temperature HYDROGEN in Use 79 66 5 psi ZERO AIR At temperature HYDROGEN add water in Use 79 66 5 psi ZERO AIR At temperature PARKER HANNIFIN ZERO...

Страница 12: ...ipment 3 Fill the DIO Reservoir at least half full with deionized water Make sure that the cell has at least 2 5cm of water showing in the cell assembly tube This can be viewed through the vents in th...

Страница 13: ...external system piping for leaks Shutdown then restart generator Check internal system piping for leaks Shutdown then restart generator No Hydrogen Delivered Check power connections see above Check w...

Страница 14: ...lletin TI FID1000C FID 1000 and 2500 Gas Stations Parker Hanni n Corporation Filtration and Separation Division Haverhill MA 1 800 343 4048 www parker com ags 14 Figure 12 FID Gas Station Exploded Vie...

Страница 15: ...rade BXE pre lter will be accessible from the side of the generator after the generator cover is removed The lter cartridge inside the housing should be changed on an annual basis to maintain ef cient...

Страница 16: ...astic parts in the genera tor These uids may cause cracking and crazing which leads to part failure Use a solution of 4 5 ml of liquid dish soap in one liter of water Re ll the water in the generator...

Страница 17: ...ration Filtration and Separation Division Haverhill MA 1 800 343 4048 www parker com ags 17 Figure 14 View Toward Rear of Unit Model FID 2500 Figure 15 Thermocouple wire Figure 16 Rear View FID 2500 s...

Страница 18: ...one hour to remove any residual oxygen and moisture from the instrument and piping downstream When the desiccant becomes saturated with moisture the blue indicating color will turn beige or gray or t...

Страница 19: ...he fuses in the FID gas station may burn out The fuses are located in the power receptacle on the back side of the generator Before servicing the fuse turn the unit off and disconnect the power cord f...

Страница 20: ...e 40 125 psig 2 7 barg 8 5 barg 40 125 psig 2 7 barg 8 5 barg Altitude 2000 M 2000 M Electrical Requirements 100 120 200 240 VAC 47 63Hz 100 120 200 240 VAC 47 63Hz Power Consumption 480 Watts 110 vac...

Страница 21: ...ay be hot and could cause burns to the skin found on inside of some units Under certain conditions metal cabinet will be warm to touch 70 C 3 Explanation of Warning Symbols Parker Hanni n UK Ltd Filte...