35
DC-PLAYHOUSE
2
1
3
4
2
5
1
CM
0
INCH
0
10
9
6
11
14
8
15
7
12
13
4
3
6
5
STEP 8
1. Centred horizontally with Upright Post, measure 1" up form bottom of Roof and drill 1/8" pilot hole through Roof and Post Cover. See
Detail 023.
2. Attach Roof to Upright Posts and Upper Post Covers using M5 x 76mm Self-Tapping Screw. See Detail 024.
3. Refer back to your Footing Detail options on pages 19 to 24 to finish assembly.
023
POST COVER
ROOF
M5 x 76mm (3")
SELF-TAPPING
SCREW (33-11-0600)
1 in
[2.58 cm]
023 024
UNDERNEATH
ROOF (02-08-0001)
024
ROOF
DRILL Ø1/8"
PILOT HOLE
POST
COVER
UPRIGHT
POST
M5 x 76mm (3")
SELF-TAPPING
SCREW (33-11-0600)
Содержание 622pg200
Страница 1: ...1 Playhouse SKU 200 622pg...
Страница 6: ...Manufacture recommends the following maintenance procedures be followed...
Страница 7: ......
Страница 12: ...14 TOOLS REQUIRED...
Страница 15: ...17 94 13 16 in 91 5 8 in ELEVATION VIEW USE ZONE WITH POST PLACEMENT HOLE LOCATIONS...