![PARK WAREHOUSE 622pg200 Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/park-warehouse/622pg200/622pg200_manual_3692807023.webp)
DC-PLAYHOUSE
25
Parts List
PART NUMBER
QTY
DESCRIPTION
02-08-0001
1
ROOF
02-08-0011
1
CLOCK PANEL (BLUE)
02-08-0014
1
SHAPES PANEL (YELLOW)
02-08-0015
1
WINDOW PANEL (BLUE)
02-08-0027
4
POST CAP
02-08-0033
8
UPPER POST COVER, 7 3/8" LG.
02-08-0046
1
GEAR PANEL (GREEN)
02-08-0149
4
CURVED LEAF CONNECTOR
02-08-0175
4
UPPER POST, 20 3/4" LG.
02-08-0176
4
UPRIGHT POST, 47 1/4" LG.
02-08-0177
2
UPRIGHT POST, 37 1/16" LG.
02-08-0178
2
UPRIGHT POST, 29 5/8" LG.
02-08-0179
1
CRAWL THROUGH PANEL (YELLOW)
02-08-0180
1
SPINNING PANEL (GREEN)
02-08-0183
4
CURVED LEAF CONNECTOR w/RECESS
02-08-0184
2
LEFT UPPER POST COVER 28 7/8" w/4 INSERTS
02-08-0185
2
RIGHT UPPER POST COVER 28 7/8" w/4 INSERTS
33-13-0109
1
33-11-0600
8
M5 x 76mm (3") SELF-TAPPING SCREW
33-11-0003
16
M10 x 25mm (1") BHCS BOLT
33-11-0010
4
M10 x 50mm (2") BHCS BOLT
HARDWARE COMPLETE
Items listed below Hardware Complete line are included with Hardware Complete Number
Warning: During Installation, Hardware And Small Parts Are Choking Hazards For Young Children. Store
Unused Parts Appropriately Until Assembly Is Completed. Once Assembly Is Completed, Remove Any
Unused Parts From The Play Environment And Dispose/Save Them In A Secure Location. Any bolt end
protruding more than two full threads beyond the face of the nut causes risk of clothing entanglement.
Promptly cut-off flush, file smooth, and treat to prevent corrosion.
Unless Otherwise Specified, All Units of Measure are Each
Note: Peen Tee-Nuts and Flatwashers to match radius of pipe after assembly is complete.
Note: Loctite (supplied by others) should be used on any non-patch hardware.
Содержание 622pg200
Страница 1: ...1 Playhouse SKU 200 622pg...
Страница 6: ...Manufacture recommends the following maintenance procedures be followed...
Страница 7: ......
Страница 12: ...14 TOOLS REQUIRED...
Страница 15: ...17 94 13 16 in 91 5 8 in ELEVATION VIEW USE ZONE WITH POST PLACEMENT HOLE LOCATIONS...