
20
FOOTING DETAIL - SURFACE MOUNT
2
1
3
4
2
5
1
CM
0
INCH
0
10
9
6
11
14
8
15
7
12
13
4
3
6
5
1. Attach Upright Posts to Footbuck Ass'y using M10 x 50mm B.H.C.S. and M10 T-Nut. Be sure to use the bottom two holes in Footbuck
Ass'y. See Detail 009. Peen T-Nut using hammer to conform around Upright Post.
2. Continue assembling unit. Refer to pages 24 to 35.
3. Using Footbuck Ass'y as template, mark hole position on concrete. Remove Footbuck Ass'y and Footer Plates and drill
3/8" Dia. x 2" deep holes into concrete to receive anchor.
4. Attach Footbuck Ass'y to Concrete using Concrete Anchor, M10 Flat Washer, and M10 Lock Nut. See Detail 011.
009
M10 x 50mm (2")
BHCS BOLT
(33-11-0010)
UPRIGHT
POST
FOOTBUCK
ASS'Y
M10 T-NUT
(33-11-0402)
Peen T-Nut using a hammer
after tightened to conform
around Upright Post.
011
CONCRETE
ANCHOR
(33-11-0702)
FOOTBUCK
ASS'Y
M10 LOCK NUT
M10 FLAT WASHER
Содержание 622pg200
Страница 1: ...1 Playhouse SKU 200 622pg...
Страница 6: ...Manufacture recommends the following maintenance procedures be followed...
Страница 7: ......
Страница 12: ...14 TOOLS REQUIRED...
Страница 15: ...17 94 13 16 in 91 5 8 in ELEVATION VIEW USE ZONE WITH POST PLACEMENT HOLE LOCATIONS...