
22
FOOTING DETAIL - ONGROUND
2
1
3
4
2
5
1
CM
0
INCH
0
10
9
6
11
14
8
15
7
12
13
4
3
6
5
1. Attach Upright Post to Footbuck Ass'y using M10 x 50mm B.H.C.S. and M10 T-Nut. Be sure to use the top two holes in Footbuck Ass'y.
See Detail 009. Peen T-Nut using hammer to conform around Upright Post.
2. Continue assembling unit. Refer to pages 24 to 35.
3. With Footbuck Ass'ys in position, secure each Footbuck Ass'y to the ground using Ground Spikes. NOTE: A 4lb. hammer may be
required to drive spikes into the ground. Install ground spikes angled inward as shown in illustration. See Detail 008.
IMPORTANT:
Refer to Post Placement/Hole Locations diagram to mark locations of Footbuck Ass'ys.
008
FOOTBUCK
ASS'Y
GROUND SPIKE
(02-07-0048)
009
Peen T-Nut using a hammer
after tightened to conform
around Upright Post.
M10 T-NUT
(33-11-0402)
FOOTBUCK
ASS'Y
UPRIGHT
POST
M10 x 50mm (2")
BHCS BOLT
(33-11-0010)
Содержание 622pg200
Страница 1: ...1 Playhouse SKU 200 622pg...
Страница 6: ...Manufacture recommends the following maintenance procedures be followed...
Страница 7: ......
Страница 12: ...14 TOOLS REQUIRED...
Страница 15: ...17 94 13 16 in 91 5 8 in ELEVATION VIEW USE ZONE WITH POST PLACEMENT HOLE LOCATIONS...