
DETAIL A
33
DC-PLAYHOUSE
2
1
3
4
2
5
1
CM
0
INCH
0
10
9
6
11
14
8
15
7
12
13
4
3
6
5
STEP 6
1. Attach Curved Leaf Connectors to Left and Right Upper Post Covers 28 7/8" w/4 Inserts using M10 x 25mm B.H.C.S. Bolt. See
Detail 021.
Orientation of Curved Leaf Connectors is critical.
2. Attach Left and RIght Upper Post Covers 28 7/8" w/4 Inserts to Upper Post 20 3/4" using M5 x 76 Self-Tapping Screw. See Detail 085.
IMPORTANT: Position Upper Post Cover and drill Ø1/8" pilot hole. Note: Orientation of Curved Leaf Connectors in relation to
panels are critical.
021
M10 x 25mm (1")
BHCS BOLT
(33-11-0003)
LEAF
CONNECTOR
085
M5 x 76mm (3")
SELF-TAPPING
SCREW (33-11-0600)
INSERT
INSERT
DRILL Ø1/8"
PILOT HOLE
UPPER POST COVER
UPPER POST
UPPER POST COVER
Ø1/8" PILOT
HOLE
CENTERED
HORIZONTALLY
CURVED LEAF
CONNECTOR
(02-08-0149)
LEFT UPPER POST
COVER 28 7/8" w/4
INSERTS
(02-08-0184)
UPRIGHT POST, 20 3/4" LG.
(02-08-0175)
PANEL
CURVED LEAF
CONNECTOR
w/RECESS
(02-08-0183)
CURVED LEAF
CONNECTOR
(02-08-0149)
LEFT UPPER POST
COVER 28 7/8" w/4
INSERTS
(02-08-0184)
021
CURVED LEAF
CONNECTOR
(02-08-0149)
085
UNDERNEATH
CURVED LEAF
CONNECTOR
w/RECESS
(02-08-0183)
RIGHT UPPER POST
COVER 28 7/8" w/4
INSERTS
(02-08-0185)
Содержание 622pg200
Страница 1: ...1 Playhouse SKU 200 622pg...
Страница 6: ...Manufacture recommends the following maintenance procedures be followed...
Страница 7: ......
Страница 12: ...14 TOOLS REQUIRED...
Страница 15: ...17 94 13 16 in 91 5 8 in ELEVATION VIEW USE ZONE WITH POST PLACEMENT HOLE LOCATIONS...