46. Before spreading sand over floor unscrew
pressure plates and fill base channel and
pressure plate areas with sand to prevent
any movement.
Re-install pressure plates

Note:

 It is very important that this step is

completed correctly. The sand has to be 
packed tightly to eliminate movement of 
pressure plate when walked upon.

48. Spread the sand over the entire floor area
to an even depth of approximately 50mm
making sure you have 50mm of sand over
the pressure plate.

49. Compact the sand on the floor by
tramping or rolling until a footprint no
longer shows.

50. Installation of liner
Remove all seats and connector plates.

51. Place the pool pad (GROUND COVER)
over the entire floor area and hold it in
position by taping in to the pool wall.

53. Position the liner so that wall-floor
seam is an equal distance from pool
wall at both ends and sides. The liner
has several seams running across the
pool floor, which must be straight and
parallel to side frames.

52. Unroll the liner in the center of the pool
with the smooth weld up. (The liner is
easier to install if left unrolled in the sun
to warm and soften) .

54. Pull the liner wall up over the pool wall
and hold in place with plastic coping strips. (7)

Note: 

Remove footwear before walking

on liner. 

LIDO     POOL

12. PREPARE COVE 
      AND SPREAD 
      SAND ON BASE 

13. INSTALL GROUND 
      COVER

14. INSTALL LINER

15. CHECK & SECURE
      LINER

47. Build up an even cove of firm sand or 
earth around the wall of the pool 
approximately 150mm and pack firmly.

Содержание 161248

Страница 1: ...LIDO INGROUND OR INDECK POOLS OVAL POOL INSTRUCTION MANUAL...

Страница 2: ...LIDO POOL A few important safety hints Enjoy Your Swimming Safely...

Страница 3: ...Set out the nal pool dimensions 8 Assemble frames for pools 9 Assemble pool ladder 10 Deepen or dish Pool centre if required 11 Install walls First decide on lter location 12 Cut wall for plumbing re...

Страница 4: ...of pieces per component WHEN ORDERING SPARE PARTS PLEASE STATE DESCRIPTION PART NO slim for wall bolts 3 2 5 3 6 7 9 10 10a 24 25 24 25 26 15 6 14 14 17 20 16 21 22 19 19 21 13 13 14 15 16 17 18 19 2...

Страница 5: ...ll x 1 18 989mtrs 2315 No 3 Wall x 1 18 989mtrs 2715 No 3a Wall x 1 21 356mtrs 3015 No 4 Wall x 1 23 723mtrs 3815 No 1 Wall x 2 28 508mtrs 1548 No 1 Wall x1 14 254mtrs 1748 No 2 Wall x 1 16 621mtrs 20...

Страница 6: ...B A A LIDO POOL Note Side braces extend 600mm out from the pool wall SET OUT FINAL DIMENSIONS FOR POOL FRAME Once the site is satisfactorily levelled accurately re mark the nal position of the pools...

Страница 7: ...om the pool wall SET OUT FINAL DIMENSIONS FOR POOL FRAME Once the site is satisfactorily levelled accurately re mark the nal position of the pools as per the dimensions on the ground plan The nal pool...

Страница 8: ...mm 3206mm To end of base channel 2261mm RADIUS APEX OF CURVE A RADIUS 2261mm 3206mm To end of base channel 1603mm PEG No 1 19mm 591mm 1181mm 1181mm 1181mm 1181mm 1181mm 7087mm PEG No 2 591mm 19m m 226...

Страница 9: ...based materials It is essential that all traces of hardy weeds be completely removed from under the pool as the may puncture the liner Vegetation such as nut grass or onion weed must be treated with...

Страница 10: ...LIDO POOL ASSEMBLE FRAMES FOR POOLS...

Страница 11: ...DES CHECK VERTICALS WITH CARPENTERS LEVEL CROSS CHECK LEVELS SAND STAKES TO POSITION BOTTOM RAILS CHECK LEVEL ASSEMBLY OF LOWER RAILS CONNECTOR 6 10 9 4 6 LIDO POOL 7A PRELIMINARY FRAME EXCAVATION 17...

Страница 12: ...ogether Tighten with washer 26 and nuts 25 21 Position frames into excavated holes 23 Check whether all uprights are level in line and level with each other 22 Install to measurements shown on ground...

Страница 13: ...f the plates are installed on soft ll the weight of water can make the vertical shift out of level If in doubt pack a small batch of concrete under plate 17 28 Your pool is now ready to concrete Check...

Страница 14: ...ker screw driver to one end of string line and from each peg scribe the required end radius measurement This will be a guide for laying the base rail 37 Slide the end rails into the connectors leaving...

Страница 15: ...by a registered electrician in accordance with AS NZS 3000 2018 MIN 800mm MAX 400mm Maximum Gradient 2 1 1 2 LIDO POOL 8 ASSEMBLE LADDER 9 DEEPEN POOL CENTRE Safety ladder designed for a pool install...

Страница 16: ...the eyeball holes are not cut This is to allow you to custom t the eyeball returns 2 in the most suitable position NOTE It Is essential that the cutting of the wall for these eyeballs is completed at...

Страница 17: ...the pool pad GROUND COVER over the entire oor area and hold it in position by taping in to the pool wall 53 Position the liner so that wall oor seam is an equal distance from pool wall at both ends an...

Страница 18: ...t not larger Fit a gasket to the eyeball then position eyeball through the liner then wall Thread lock nut on and tighten Proceed with the connecting of the plumbing Do not cover pipes until you have...

Страница 19: ...Takapuna 11 Barrys Point Rd Takapuna Auckland 0622 Email northshore paramountpools co nz www...

Отзывы: