7B. SIDEWALL ASSEMBLY
32. and 33.
Note:
During assembly take
special care when handling the sidewall.
Careless handling may result in a
buckled wall, when erecting. Assembly
on very windy days should be avoided.
If a colourband wall is being installed,
select colour preference and unroll
accordingly.
Locate Centre Point Between Pressure
Plates.
Centre Point is 1603mm from pressure plate.
34. Locate peg positions 1 and 2 as
shown in ground plan.
35. Tie a marker (screw driver) to one end
of string line and from each peg scribe the
required end radius measurement. This will
be a guide for laying the base rail.
37. Slide the end rails into the connectors
leaving approximately 32mm gap between them,
and position with stakes so the rails conform to
the radii marked out previously.
38. Check the distance to the apex of the
curve from pegs 1 and 2 making sure
the apex is in line with the 2 pegs
(see ground plan).
LIDO POOL
36. Select and install bottom rails for
between side supports; these rails have
a larger radii than the end rails.
2012 = 2 rails, 2315 = 2 rails
2412 = 4 rails, 2715 = 4 rails
3015 = 6 rails, 3815 = 10 rails
Содержание 161248
Страница 1: ...LIDO INGROUND OR INDECK POOLS OVAL POOL INSTRUCTION MANUAL...
Страница 2: ...LIDO POOL A few important safety hints Enjoy Your Swimming Safely...
Страница 10: ...LIDO POOL ASSEMBLE FRAMES FOR POOLS...
Страница 19: ...Takapuna 11 Barrys Point Rd Takapuna Auckland 0622 Email northshore paramountpools co nz www...