background image

2412

2315

LIDO     POOL

Note: Side braces extend 600mm out from the pool wall.

SET OUT FINAL DIMENSIONS FOR POOL FRAME

Once the site is satisfactorily levelled, accurately re-mark the final position of the pools
as per the dimensions on the ground plan. The final pool marking should come within the
previously levelled area. 

Содержание 161248

Страница 1: ...LIDO INGROUND OR INDECK POOLS OVAL POOL INSTRUCTION MANUAL...

Страница 2: ...LIDO POOL A few important safety hints Enjoy Your Swimming Safely...

Страница 3: ...Set out the nal pool dimensions 8 Assemble frames for pools 9 Assemble pool ladder 10 Deepen or dish Pool centre if required 11 Install walls First decide on lter location 12 Cut wall for plumbing re...

Страница 4: ...of pieces per component WHEN ORDERING SPARE PARTS PLEASE STATE DESCRIPTION PART NO slim for wall bolts 3 2 5 3 6 7 9 10 10a 24 25 24 25 26 15 6 14 14 17 20 16 21 22 19 19 21 13 13 14 15 16 17 18 19 2...

Страница 5: ...ll x 1 18 989mtrs 2315 No 3 Wall x 1 18 989mtrs 2715 No 3a Wall x 1 21 356mtrs 3015 No 4 Wall x 1 23 723mtrs 3815 No 1 Wall x 2 28 508mtrs 1548 No 1 Wall x1 14 254mtrs 1748 No 2 Wall x 1 16 621mtrs 20...

Страница 6: ...B A A LIDO POOL Note Side braces extend 600mm out from the pool wall SET OUT FINAL DIMENSIONS FOR POOL FRAME Once the site is satisfactorily levelled accurately re mark the nal position of the pools...

Страница 7: ...om the pool wall SET OUT FINAL DIMENSIONS FOR POOL FRAME Once the site is satisfactorily levelled accurately re mark the nal position of the pools as per the dimensions on the ground plan The nal pool...

Страница 8: ...mm 3206mm To end of base channel 2261mm RADIUS APEX OF CURVE A RADIUS 2261mm 3206mm To end of base channel 1603mm PEG No 1 19mm 591mm 1181mm 1181mm 1181mm 1181mm 1181mm 7087mm PEG No 2 591mm 19m m 226...

Страница 9: ...based materials It is essential that all traces of hardy weeds be completely removed from under the pool as the may puncture the liner Vegetation such as nut grass or onion weed must be treated with...

Страница 10: ...LIDO POOL ASSEMBLE FRAMES FOR POOLS...

Страница 11: ...DES CHECK VERTICALS WITH CARPENTERS LEVEL CROSS CHECK LEVELS SAND STAKES TO POSITION BOTTOM RAILS CHECK LEVEL ASSEMBLY OF LOWER RAILS CONNECTOR 6 10 9 4 6 LIDO POOL 7A PRELIMINARY FRAME EXCAVATION 17...

Страница 12: ...ogether Tighten with washer 26 and nuts 25 21 Position frames into excavated holes 23 Check whether all uprights are level in line and level with each other 22 Install to measurements shown on ground...

Страница 13: ...f the plates are installed on soft ll the weight of water can make the vertical shift out of level If in doubt pack a small batch of concrete under plate 17 28 Your pool is now ready to concrete Check...

Страница 14: ...ker screw driver to one end of string line and from each peg scribe the required end radius measurement This will be a guide for laying the base rail 37 Slide the end rails into the connectors leaving...

Страница 15: ...by a registered electrician in accordance with AS NZS 3000 2018 MIN 800mm MAX 400mm Maximum Gradient 2 1 1 2 LIDO POOL 8 ASSEMBLE LADDER 9 DEEPEN POOL CENTRE Safety ladder designed for a pool install...

Страница 16: ...the eyeball holes are not cut This is to allow you to custom t the eyeball returns 2 in the most suitable position NOTE It Is essential that the cutting of the wall for these eyeballs is completed at...

Страница 17: ...the pool pad GROUND COVER over the entire oor area and hold it in position by taping in to the pool wall 53 Position the liner so that wall oor seam is an equal distance from pool wall at both ends an...

Страница 18: ...t not larger Fit a gasket to the eyeball then position eyeball through the liner then wall Thread lock nut on and tighten Proceed with the connecting of the plumbing Do not cover pipes until you have...

Страница 19: ...Takapuna 11 Barrys Point Rd Takapuna Auckland 0622 Email northshore paramountpools co nz www...