Parallel redundant & power system UPS 60…800kVA FXS – Operating manual
Sistema parallelo ridondante e di potenza UPS 60…800kVA FXS – Manuale operativo
24 of 79
JUD413937
Rev.A JSE414215 07/06/11
If the configuration of the units involved has been verified at this stage, proceed
to start-up when the message “OPEN ALL MBCB” appears.
After this move the Bypass-Switch of the units. The parallel-system will take
over the load if “N-1” switches have been set in position “Normal”.
Move the last Bypass-Switch into position “Normal”.
The UPS feed the load in parallel if the message “Start-up end” appears.