Index
IN-2
8800-A2-GN21-20
October 1997
I
installation site consideration, 2-3
installation tasks
connecting to a CO alarm system, 2-21
connecting to a modem for remote management,
2-25
connecting to a POTS splitter, 2-19
connecting to a remote workstation, 2-23
connecting to a terminal or computer, 2-24
connecting to an MDF, 2-19
connecting to an SNMP management system, 2-23
connecting to Ethernet hubs or switches, 2-22
installing optional air filter, 2-12
installing the chassis, 2-5
installing the DSL cards, 2-17
installing the MCC card, 2-15
set-back installation, 2-5
summary of tasks, 2-4
supplying power, 2-13
verifying the installation, 2-18
installing chassis in a 19-inch rack, 2-6
installing chassis in a 23-inch rack, 2-7
installing the chassis
back-to-back mounting, 2-11
rack without threaded screw holes, 2-10
Interfaces, C-1
L
LEDs
on the 8800 chassis, A-1
on the MCC card, A-3
load sharing, 1-4
M
Main Distributing Frame (MDF), 2-19
making cable connections, 2-19
Management Communications Controller (MCC) card,
1-3
installing the card, 2-15
removing the card, 2-16
setting the IP address, 3-1
setting the subnet mask, 3-1
Media Access Control (MAC) address, 2-16, 2-18
modem connection, 2-25
mounting configurations, 1-5
N
NEBS, C-2
Network Equipment Building Standards, 1-4, C-2
NEBS, 1-4
O
operating environment, C-2
organization of guide, iv
P
package contents
associated hardware, 2-2
chassis, 2-1
documentation, 2-2
optional air filter, 2-2
physical dimensions, C-1
pinouts
CO alarm 6-pin modular connector, B-2
LAN/WAN connectors, B-1
management 10BaseT connector, B-1
management serial 8-pin modular connector, B-2
Telco 50-pin, B-3
POTS Splitter, 1-1, 2-19
power considerations, 2-3
power failure, 4-1
power redundancy, 1-4
power specifications, C-1
pre-installation considerations, 2-3