Paradyne Hotwire 8620 Скачать руководство пользователя страница 3

8620-A2-GN20-50

June 2004

B

Software and Firmware License Agreement

The terms and conditions of this License Agreement (the “Agreement”) will apply to the software and/or firmware 
(individually or collectively the “Software”) incorporated into the Paradyne product (the “Product”) purchased by you and 
any derivatives obtained from the Software, including any copy of either. If you have executed a separate written 
agreement covering the Software supplied to you under this purchase, such separate written agreement shall govern.

Paradyne Corporation (“Paradyne”) grants to you, and you (“Licensee”) agree to accept a personal, non-transferable, 
non-exclusive, right (without the right to sublicense) to use the Software, solely as it is intended and solely as 
incorporated in the Product purchased from Paradyne or its authorized distributor or reseller under the following terms 
and conditions:

1. Ownership: The Software is the sole property of Paradyne and/or its licensors. The Licensee acquires no title, right 

or interest in the Software other than the license granted under this Agreement.

2. Licensee shall not use the Software in any country other than the country in which the Product was rightfully 

purchased except upon prior written notice to Paradyne and an agreement in writing to additional terms.

3. The Licensee shall not reverse engineer, decompile or disassemble the Software in whole or in part.

4. The Licensee shall not copy the Software except for a single archival copy.

5. Except for the Product warranty contained in the manual, the Software is provided “AS IS” and in its present state 

and condition and Paradyne makes no other warranty whatsoever with respect to the Product purchased by you. 
THIS AGREEMENT EXPRESSLY EXCLUDES ALL OTHER WARRANTIES, WHETHER EXPRESS OR IMPLIED, 
OR ORAL OR WRITTEN, INCLUDING WITHOUT LIMITATION:

a.

Any warranty that the Software is error-free, will operate uninterrupted in your operating environment, or is 
compatible with any equipment or software configurations; and

b.

ANY AND ALL IMPLIED WARRANTIES, INCLUDING WITHOUT LIMITATION IMPLIED WARRANTIES OF 
MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE AND NON-INFRINGEMENT.

Some states or other jurisdictions do not allow the exclusion of implied warranties on limitations on how long an 
implied warranty lasts, so the above limitations may not apply to you. This warranty gives you specific legal rights, 
and you may also have other rights which vary from one state or jurisdiction to another.

6. In no event will Paradyne be liable to Licensee for any consequential, incidental, punitive or special damages, 

including any lost profits or lost savings, loss of business information or business interruption or other pecuniary 
loss arising out of the use or inability to use the Software, whether based on contract, tort, warranty or other legal 
or equitable grounds, even if Paradyne has been advised of the possibility of such damages, or for any claim by 
any third party.

7. The rights granted under this Agreement may not be assigned, sublicensed or otherwise transferred by the 

Licensee to any third party without the prior written consent of Paradyne.

8. This Agreement and the license granted under this Agreement shall be terminated in the event of breach by the 

Licensee of any provisions of this Agreement. 

9. Upon such termination, the Licensee shall refrain from any further use of the Software and destroy the original and 

all copies of the Software in the possession of Licensee together with all documentation and related materials.

10. This Agreement shall be governed by the laws of the State of Florida, without regard to its provisions concerning 

conflicts of laws.

ONCE YOU HAVE READ THIS LICENSE AGREEMENT AND AGREE TO ITS TERMS, YOU MAY USE THE
SOFTWARE AND/OR FIRMWARE INCORPORATED INTO THE PARADYNE PRODUCT. BY USING THE
PARADYNE PRODUCT YOU SHOW YOUR ACCEPTANCE OF THE TERMS OF THIS LICENSE AGREEMENT.

IN THE EVENT THAT YOU DO NOT AGREE WITH ANY OF THE TERMS OF THIS LICENSE AGREEMENT,
PROMPTLY RETURN THE UNUSED PRODUCT IN ITS ORIGINAL PACKAGING AND YOUR SALES RECEIPT
OR INVOICE TO THE LOCATION WHERE YOU OBTAINED THE PARADYNE PRODUCT OR THE LOCATION
FROM WHICH IT WAS SHIPPED TO YOU, AS APPLICABLE, AND YOU WILL RECEIVE A REFUND OR CREDIT
FOR THE PARADYNE PRODUCT PURCHASED BY YOU.

Содержание Hotwire 8620

Страница 1: ...8620 Broadband Access Concentrator Installation Guide Document No 8620 A2 GN20 50 June 2004...

Страница 2: ...sentative service representative or distributor directly for any help needed For additional information concerning warranty sales service repair installation documentation training distributor locatio...

Страница 3: ...NG WITHOUT LIMITATION IMPLIED WARRANTIES OF MERCHANTABILITY FITNESS FOR A PARTICULAR PURPOSE AND NON INFRINGEMENT Some states or other jurisdictions do not allow the exclusion of implied warranties on...

Страница 4: ...wo or more buildings If products installed in separate buildings are interconnected the voltage potential may cause a hazardous condition Consult a qualified electrical consultant to determine whether...

Страница 5: ...ressly approved by Paradyne Corporation CANADA EMI NOTICE This Class A digital apparatus meets all requirements of the Canadian interference causing equipment regulations Cet appareil num rique de la...

Страница 6: ...t exceed 5 CE Marking When the product is marked with the CE mark on the equipment label a supporting Declaration of Conformity may be downloaded from the Paradyne World Wide Web site at www paradyne...

Страница 7: ...ware 2 3 Package Contents 2 3 Mounting Configurations 2 4 8620 BAC Installation 2 5 Placing the 8620 Chassis on a Desktop or Table 2 5 Rack Mounting the 8620 BAC 2 6 Attaching the Mounting Brackets 2...

Страница 8: ...inal or PC 3 6 Connecting to a Modem for Remote Management with MCP 3 7 Connecting an MCP to an SNMP Management System 3 8 Connecting CO Alarm to the Alarm System 3 9 4 Troubleshooting Troubleshooting...

Страница 9: ...ary Section Description Chapter 1 Introduction Provides general information about what types of cards can be used in the 8620 BAC and describe features of the BAC Chapter 2 Installation Describes what...

Страница 10: ...Shelf Concentration Module SCM Card Installation Instructions 8303 A2 GZ40 Hotwire 8303 8304 IDSL Cards Installation Instructions 8312 A2 GZ40 Hotwire 8312 8314 MVL and ReachDSL MVL Cards Installation...

Страница 11: ...nation Unit with DSX 1 Interface User s Guide 8784 A2 GZ40 Hotwire 8784 TDM SDSL Termination Unit with DSX 1 Interface Installation Instructions 8786 A2 GB20 Hotwire 8786 TDM SDSL Termination Unit wit...

Страница 12: ...About This Guide vi June 2004 8620 A2 GN20 50...

Страница 13: ...ultiple DSL port cards With Release 3 0 of the BAC there are two configurations SCP card based A Shelf Concentration and Processing SCP card is installed in Slot A to provide the management and aggreg...

Страница 14: ...ent for both the MCP card and the SCM card MCP card Administers and provides diagnostic connectivity to the line cards The MCP acts as a mid level manager and works in conjunction with an SNMP network...

Страница 15: ...acket SDSL CAP card with ATM uplink that interoperates with the 6341 and 6342 SDSL Routers 8355 24 port ReachDSL card that interoperates with the Hotwire 6390 ReachDSL modem 8365 12 port ATM Asymmetri...

Страница 16: ...y the system This is done automatically without system disruption Hot Swappable Cards The MCP and line cards can be installed and removed from the 8620 BAC without service disruption You can replace t...

Страница 17: ...M I N O R ALARMS ALARM CLOCK A B SERIAL SCM MCP LAN SCM MCP SIM AC INPUT S Y S T E M A c ti v e S ta n d b y A la r m T X R X E T H E R N E T T e s t U P L I N K L K 1 L K 2 L K 3 L K 4 L K 5 L K 6 L...

Страница 18: ...1 Introduction 1 6 June 2004 8620 A2 GN20 50...

Страница 19: ...cient clearance at the rear of the chassis for cabling In any installation leave a clearance of at least 3 5 inches 9 cm on both sides of the chassis for airflow Power The AC power version requires a...

Страница 20: ...MANAGEMENT MCP port to a 10 100 BaseT hub connector connected to an SNMP management system network for Slot 1 in the base chassis For TDM SDSL and TDM SHDSL cards refer to the appropriate card Install...

Страница 21: ...bag Set of four rubber feet for desktop mounting Four 10 32 mounting screws for mounting in a rack or cabinet Four 12 24 mounting screws and four 12 24 self retaining nuts for use with racks without t...

Страница 22: ...Te st T X R X C ol l E T H E R N E T U pl in k A lr m TX RX IP MVL 8314 S Y S T E M O K A lrm Te st T X R X LO C 1 2 3 4 A T M B U S D S L P O R T 5 6 7 8 9 10 11 12 MCP 8000 S Y S T E M O K A lrm Te...

Страница 23: ...stalled in a rack You will need a large flat blade screwdriver and a Phillips screwdriver to install the 8620 chassis Placing the 8620 Chassis on a Desktop or Table Procedure To install the 8620 chass...

Страница 24: ...g holes in the rack have been selected Attaching the Mounting Brackets Procedure To attach mounting brackets to the 8620 chassis for rack mounting 1 Determine whether you will be front mounting the ch...

Страница 25: ...elected holes in the rack and install the screws into the chassis mounting bracket and the self retaining nut if used Tighten all four screws until the chassis and is securely mounted in the rack The...

Страница 26: ...of the wire into the open end of the GND lug and tighten the lug s screw Make sure it makes contact with the stripped portion of the wire ESD Wrist Strap Jack A noninsulated banana jack is located at...

Страница 27: ...he DC version has two separate DC inputs A and B to provide power redundancy AC power 100 240 V nominal 50 60 Hz maximum current draw is 4 A at 120 VAC The AC version can provide power redundancy if a...

Страница 28: ...in the terminal block and no bare wire should be exposed outside of the block 2 Clearly label these power source wires as 48V and RTN respectively 3 Turn on power to the 8620 BAC 4 Make sure the PWR A...

Страница 29: ...8V B and RTN B respectively 3 Turn on power to the 8620 BAC 4 Make sure the PWR A and PWR B LEDs on the front panel are both ON green Insert Power Source Into the Negative side of the first power sour...

Страница 30: ...power 3 Make sure the PWR A LED on the front panel is ON green 04 16897 01 AC INPUT MCP 8000 SY ST EM OK Al rm Te st TX RX Co ll ET HE RN ET ESD SIM A 1 2 3 AC OU TLE T DC FUS ES A B 48V RTN A B A B...

Страница 31: ...y within the terminal block and no bare wire should be exposed outside of the block NOTE You should clearly label these power source wires as 48V and RTN respectively 3 Plug the other end of the AC po...

Страница 32: ...he faceplate Then simply push the ejector handles outward and slide the card out To remove an SCP or SCM card unscrew both ends of the card s faceplate then pull the levers inward and slide the card o...

Страница 33: ...s required to maintain proper gasket pressure on the faceplate as well as proper air flow NOTE For detailed information about the configuration and operation of the circuit card see the appropriate ca...

Страница 34: ...SYSTEM ACTIVE LED is cycling off and on If you installed an MCP card verify that the SYSTEM OK LED is cycling off and on Verify that the SYSTEM OK LED on any line cards is cycling off and on If these...

Страница 35: ...d to make the necessary cable connections to Network Tip and Ring connections Terminal or Personal Computer PC Modem for remote management SNMP management system Terminal laptop computer or modem Alar...

Страница 36: ...hole in the plastic at the other end The connector s captive screw must be replaced with a shorter one supplied with the chassis You can attach the cable to the chassis using the cable ties provided o...

Страница 37: ...e 8620 chassis 3 Thread the provided cable tie through the anchor mount on the end of the connector where the cable will lie Tighten the cable tie around the connector and cut off any excess 4 Secure...

Страница 38: ...the locking pivot bracket onto the cable end of the connector using the captive screw as illustrated below 3 Insert the bottom edge of the locking pivot bracket inside the lower edge of the rear panel...

Страница 39: ...MDF or demarcation point Connecting an SCP Card to a Terminal or PC Procedure To connect an SCP card to a terminal or PC 1 Plug the end of an 8 pin modular cable into SERIAL SCM connector of the SIM...

Страница 40: ...an MCP Card to a Terminal or PC Procedure To connect an MCP card to a terminal or PC 1 Plug the end of an 8 pin modular cable into SERIAL MCP of the SIM which corresponds to the MCP card in Slot 1 of...

Страница 41: ...originate mode only For example ATQ2 Set the modem to ignore Data Terminal Ready DTR For example AT D0 Procedure To connect the 8620 BAC to a dial up modem 1 Connect an 8 pin modular plug ended seria...

Страница 42: ...system or for Telnet access 1 Plug the end of an 8 pin modular cable into LAN MCP jack of the SIM which corresponds to the MCP card in Slot 1 of the chassis 2 Plug the other end of the cable into the...

Страница 43: ...ts Connecting Clock Sources to Clock A and Clock B The following procedure is optional Follow this procedure only if you want to use external BITS Building Integrated Timing Supply clocking in an SCP...

Страница 44: ...3 Cabling 3 10 June 2004 8620 A2 GN20 50...

Страница 45: ...plates in the chassis are properly secured by the screws on the faceplate If you still experience difficulty in seating the card call service Card may be slightly warped Manipulate the card until it...

Страница 46: ...icated check the Ethernet connections for the SCP and line card 3 Remove and reinstall the card 4 If unable to clear by reinstalling the card replace the card For an MCP based chassis 1 Choose Card Se...

Страница 47: ...rd with alarm conditions will also have its Alarm LED lit No major alarms Minor Alarm Yellow Off Minor alarm present on any of the cards or Power Alarm problem in the chassis The card with alarm condi...

Страница 48: ...4 Troubleshooting 4 4 June 2004 8620 A2 GN20 50...

Страница 49: ...is installed the Clock A and Clock B connectors may be used for system clocking They have the following pin assignments Pin Number Use 1 Not used 2 Closed on major alarm 3 Common on major alarm 4 Ope...

Страница 50: ...the SCP card s command line interface is a DCE type connection with the following pin assignments Pin Number Use 1 TX Data 2 TX Data 3 RX Data 4 Reserved 5 Reserved 6 RX Data 7 Reserved 8 Reserved 99...

Страница 51: ...the MCP s asynchronous terminal interface is a DCE type connection with the following pin assignments NOTE The serial port is active only on the base unit Pin Number Function 1 Reserved 2 Reserved 3...

Страница 52: ...t No 002 0091 0031 is used to convert the 8 pin modular serial interface to a standard DB9 interface which can then be connected to a laptop computer The following table lists the pin assignments 8 Pi...

Страница 53: ...th POTS then to the Main Distribution Frame MDF The following table lists the pin assignments for each of these interfaces CONN for Slots 1 3 CONN PINS Ring Tip Port 1 1 26 Port 2 2 27 Port 3 3 28 Por...

Страница 54: ...A Pinouts A 6 June 2004 8620 A2 GN20 50...

Страница 55: ...ular jack for the Alarm Relay Interface connection Power The 8620 BAC is available in an AC powered version and a DC powered version The AC version can be connected to a DC source to provide power red...

Страница 56: ...rops below 60 C Operating Environment Ambient Temperature for system 32 to 122 F 0 to 50 C Ambient Temperature for chassis only 32 to 140 F 0 to 60 C Relative Humidity 15 to 99 noncondensing Shock and...

Страница 57: ...erfaces B 1 interoperability of line cards 1 4 ISP Internet Service Provider 1 1 L LEDs 2 16 4 3 line cards 1 3 locking pivot bracket 3 4 M MCP 1 2 interoperability 1 4 mounting configurations 2 4 att...

Страница 58: ...50 R ReachDSL card 1 3 related documents iv RT Remote Terminal 1 1 S SCM 1 2 interoperability 1 4 SCP card 1 2 interoperability 1 4 site 2 1 SNMP 1 4 cabling 3 6 3 8 T technical specifications B 1 tr...

Отзывы: