1. Installation
1-14
October
2002
4200-A2-GN20-10
3. Slide the uplink module into the guide rails just inside the opening. Press the
uplink module firmly into place until it is fully seated and the faceplate of the
uplink module is flush against the faceplate of the GranDSLAM 4200.
4. Fasten the two screws provided with the uplink module.
Do not plug in the unit. Proceed to
Chapter 2,
Cabling
.
02-17267
1
12
13
24
4
8
16
20
POWER
A
ALARM
RTN -48V
DC
BITS
MGMT
CONSOLE
ST
A
TUS
UPLINK
ALRM
TEST
B
A
3.5 A 60
B
E1 MODU
LE
4202
TX
RX
100/120
Ω
75
Ω
Содержание GranDSLAM 4200
Страница 1: ...GranDSLAM 4200 ATM Stackable DSLAM Installation Guide Document No 4200 A2 GN20 10 October 2002...
Страница 6: ...E October 2002 4200 A2 GN20 10...
Страница 42: ...2 Cabling 2 18 October 2002 4200 A2 GN20 10...
Страница 50: ...4 Configuration 4 6 October 2002 4200 A2 GN20 10...
Страница 58: ...A Connectors and Pin Assignments A 8 October 2002 4200 A2 GN20 10...
Страница 68: ...Index IN 4 October 2002 4200 A2 GN20 10...