1. Installation
1-6
October
2002
4200-A2-GN20-10
Mounting Configurations
Three basic installation configurations are available:
Rack mount – see
Installing the Brackets for Rack Mounting
on page 1-6 and
Installing the GranDSLAM 4200 Into a Rack
on page 1-8.
Wall mount – see
Installing the GranDSLAM 4200 on a Wall
on page 1-10.
Shelf or desktop – see
Installing the GranDSLAM 4200 on a Shelf or Desktop
on page 1-12.
Mounting Brackets
Your GranDSLAM 4200 can be installed in a rack or on the wall using mounting
brackets. Two brackets suitable for a 19-inch (483 mm ) rack (marked EIA-19) and
two brackets suitable for a 23-inch (584 mm ) Bay Networks or Nortel rack (marked
with Paradyne Part Number 868-6282-0020) are shipped with the unit. Two
brackets suitable for a 21-inch (535 mm ) rack (marked ETSI) are available from
Paradyne as a separate feature (see
Appendix B,
Equipment List
).
Rack-mounting brackets may also be used to attach the unit to a wall.
NOTE:
In this guide, the term
rack
refers to any rack, cabinet, frame, or bay suitable
for mounting telecommunications equipment.
Installing the Brackets for Rack Mounting
Procedure
To install the mounting brackets for rack mounting:
1. Locate the black screw nearest the front panel on each side of the unit as
shown.
2. Remove these two black screws (one from each side) before attempting to
install the mounting brackets.
02-17274
1
12
13
24
DSL POR
TS 1-24
POTS 1-24
4
8
16
20
POWER
A
ALARM
RTN -48V
DC
BITS
MGMT
CONSOLE
ST
A
T
US
UPLINK
ALRM
TEST
B
A
3.5 A 60
B
E1 MODULE
4202
TX
RX
120
Ω
75
Ω
Содержание GranDSLAM 4200
Страница 1: ...GranDSLAM 4200 ATM Stackable DSLAM Installation Guide Document No 4200 A2 GN20 10 October 2002...
Страница 6: ...E October 2002 4200 A2 GN20 10...
Страница 42: ...2 Cabling 2 18 October 2002 4200 A2 GN20 10...
Страница 50: ...4 Configuration 4 6 October 2002 4200 A2 GN20 10...
Страница 58: ...A Connectors and Pin Assignments A 8 October 2002 4200 A2 GN20 10...
Страница 68: ...Index IN 4 October 2002 4200 A2 GN20 10...