Site Preparation Checklist
Preparation for installation of the FrameSaver SLV 9520-ILM includes the following
steps:
❑
Identify a suitable location for installation:
—
Verify that there is a nearby unshared ac power source, preferably from an
Uninterruptable Power Supply (UPS). If a redundant power supply is used,
verify that there is a second source available.
—
Verify that there is free vertical space of at least 7 inches (180 mm) in the rack
for each FrameSaver SLV 9520-ILM to be installed. See the
FrameSaver SLV
Technical Description (9000-A2-GB30)
for the complete dimensions of the unit.
—
There must be clearance of at least 4 inches (100 mm) at the back of the units
for cabling. Access to the back of the unit is required during installation or when
test equipment is connected to the unit.
—
The front of the unit must be visible so that LEDs can be monitored. Access to
the front of the unit is also required in the event the front panel assembly must
be replaced.
—
The ambient temperature of the site must be in the range of 0° to 50°C (32° to
122°F).
❑
Determine location of your T3, DTE, LAN, and monitor interfaces.
❑
Procure cables of appropriate types and lengths (see
Table 1, Cables Required
,
and
Table 2, Maximum Cable Lengths
).
❑
Install and position the cables for eventual attachment to the FrameSaver SLV
9520-ILM.
Installing the FrameSaver SLV 9520-ILM
Physical installation of the FrameSaver SLV 9520-ILM includes:
Procuring the required cables
Mounting the FrameSaver SLV 9520-ILM in a rack
Connecting to power
Observing the Power-On Self-Test