21
3.
Take the end of the transmit cable and push it on to the CPE TX connector on the
back of the unit. Turn the cable connector clockwise to lock it.
4.
Connect the other end of the transmit cable to the receive port of the CPE DTE.
5.
Fix the cables to the rail with a cable tie or other strain relief device.
Verification:
❑
Are the Port 1 TD and RD LEDs blinking, and are the Port 1 OOF, LOS, AIS, and
YEL LEDs off?
—
If yes, the port is set up correctly and is operational.
—
If no, check that both ends of the cable are properly seated and secured. Verify
that the T3 User Ports Physical options are configured correctly.
❑
Check Health and Status in the left column of the System and Test Status screen for
messages.
Main Menu
→
Status
→
System and Test Status
—
If
System Operational
appears, the Port interface is set up correctly and is
operational.
—
If
System Operational
does not appear, refer to
Status Information in the
FrameSaver SLV Operations Guide (9000-A2-GB33)
.
NOTE:
When any error conditions are detected, a status message appears along the
bottom right corner of the screen.
CPE TX
DS3
CPE DTE
00-16779
1
2
3
5
4
CPE RX
Содержание FrameServer SLV 9520-ILM
Страница 28: ...28 9520 A2 GN11 10 9520 A2 GN11 10...