22
Checking that Data is Being Received
Procedure
1.
Return to the Main Menu
.
2.
Select Performance Statistics
,
and select an interface’s frame relay statistics.
Main Menu
→
Status
→
Performance Statistics
→
Frame Relay
→
Net1-FR1
3.
Verify that the Frames Received and Characters Received counts under the Frame
Relay Link statistics are incrementing, and there are no errors under the Frame
Relay LMI statistics.
—
If count increments occur after refreshing the screen, the unit is receiving data.
—
If data is not being received, recheck the cable connections, and replace or
repair a damaged cable. Recheck LMI status; you may need to contact your
service provider. Next, check the DLCI’s status.
Checking PVC Connections
Procedure
Check PVC connections to verify that all PVCs, including management PVCs, are
configured, and to see whether the PVC is active or not.
1.
Return to the Status menu
.
2.
Select PVC Connection Status.
The PVC Connection Status screen shows all PVC connections; the interface
source and DLCI number of the incoming data linked to the interface and DLCI
number for the outgoing data. You can also see whether the PVC is active.
3.
Verify that each PVC is active.
—
If active, the FrameSaver unit should be passing data.
—
If not active, no data traffic can be carried by the PVC. If the PVC is configured
correctly, the circuit may be down.
Содержание FrameServer SLV 9520-ILM
Страница 28: ...28 9520 A2 GN11 10 9520 A2 GN11 10...