6. Troubleshooting
9123-A2-GB20-20
August 2001
6-17
PVC Tests
PVC tests can be run on a requested DLCI for a selected interface. The
FrameSaver unit must be operating in frame relay mode.
When PVC tests are on a multiplexed DLCI between FrameSaver devices,
they are nondisruptive to data, so user data can continue to be sent during a
test.
If the device at one end of the circuit is not a FrameSaver device, PVC tests
are on a standard DLCI and are disruptive to data. Also, the Connectivity test
would not appear.
Loopback, and send/monitor pattern tests are available for each interface on the
selected DLCI. FrameSaver devices should be at each end of the circuit. If a
PVC Loopback is started at one end of the circuit, the other end can send and
monitor pattern tests.
The example below shows a PVC Test screen for a FrameSaver unit with the
multiplexed DLCI 550 selected. If a standard DLCI was selected, (
Disruptive
),
rather than (
Non-Disruptive
), would be displayed after Test. Also, the
Connectivity test would not appear.
PVC Tests Screen Example
NOTE:
Errors encountered during these tests may be caused by mismatched CIRs in
the two FrameSaver units. If errors are detected, verify the CIR configuration
and retest.
main/test/network_pvc 9123-C-SLV
Device Name: Node A 3/26/2000 23:32
NETWORK PVC TESTS
DLCI Number: 550
Test (Non-Disruptive) Command Status Result
PVC Loopback: Start Inactive 0:00:00
Send Pattern: Start Inactive 0:00:00
Monitor Pattern: Start Inactive 0:00:00
Sequence Errors 99999+
Data Errors 99999+
Connectivity: Start Inactive RndTrip Time (ms) 99999
--------------------------------------------------------------------------------
Ctrl-a to access these functions, ESC for previous menu MainMenu Exit
Содержание FrameSaver FLEX 9123
Страница 1: ...FrameSaver FLEX 9123 User s Guide Document No 9123 A2 GB20 20 August 2001 ...
Страница 10: ...Contents viii August 2001 9123 A2 GB20 20 ...
Страница 24: ...1 About the FrameSaver FLEX 9123 1 10 August 2001 9123 A2 GB20 20 ...
Страница 34: ...2 User Interface and Basic Operation 2 10 August 2001 9123 A2 GB20 20 ...
Страница 98: ...3 Configuration 3 64 August 2001 9123 A2 GB20 20 ...
Страница 194: ...7 Setting Up OpenLane for FrameSaver Devices and Activating SLV Capability 7 10 August 2001 9123 A2 GB20 20 ...
Страница 212: ...8 Setting Up NetScout Manager Plus for FrameSaver Devices 8 18 August 2001 9123 A2 GB20 20 ...
Страница 228: ...A Menu Hierarchy A 6 August 2001 9123 A2 GB20 20 ...
Страница 258: ...B SNMP MIBs and Traps and RMON Alarm Defaults B 30 August 2001 9123 A2 GB20 20 ...
Страница 266: ...C Connectors Cables and Pin Assignments C 8 August 2001 9123 A2 GB20 20 ...