Page 7 of 27
Issued: 2022-08-12
Rev. 2
Assemble the Legs (Item 13) and Sandpads (Item 12)
1-C)
Check or install bunk spacers and bushings.
1-D)
Repeat Steps A-C for both the Front and Rear H-Frame assemblies.
Step 2:
Step 2:
Hardware required:
• 4x 3/8”-16 - 3 3/4” Long Hex
Bolts
• 4x 3/8”-16 - Kep Nuts
• 4x 3/8” - Flat Washers
Make sure the bunk
spacers are installed
under the black wear
bushings
WARNING!
6f
t Lif
ting R
ange
5f
t Lif
ting R
ange
1-E)
Torque the bolted connections to 23 ft-lbs and mark the nuts as torqued with the torque seal/
paint marker.
8x 1.9” OD, 1 1/2” ID,
~5/16” thick - Bunk
Spacer
8x Black Plastic Wear
Bushing
*Double hardware quantity for Dual PWC Lift