![Paradise Datacom PH-2K-5 Скачать руководство пользователя страница 10](http://html2.mh-extra.com/html/paradise-datacom/ph-2k-5/ph-2k-5_installation-and-use-manual_4925673010.webp)
Page 10 of 27
Issued: 2022-08-12
Rev. 2
4-A)
Use a tape measure and pencil to mark the approximate location of the main beams as
indicated below:
Assemble the Main Beams (Item 9) on the End Beams
(Item 10)
Step 4:
Step 4:
• 8x 3/8”-16 - 4 1/2” Long Hex
Bolts
• 8x 3/8”-16 - Kep Nuts
• 8x 3/8” - Flat Washers
Hardware required:
*Double hardware quantity for Dual PWC Lift
• 8x 1/2”-13 - 3” Long Hex
Bolts
• 8x 1/2”-13 - Nylock Nuts
• 16x 1/2” - Flat Washers
Single PWC Lift
Dual PWC Lift