
27
Back and forth wave action:
I this example two opposing hydro wizard® are used to generate
a wave. hydro wizard®
A
should run in the first half of the time
segment with 100% power, and hydro wizard®
B
in the second
segment with the same power. To achieve this use the phase
synchronization in SYNC mode.
Required Settings:
hydro wizard
®
A:
Connection
Master
Mode
Welle
Settings
Current A
100%
Settings
Current B
1%
Settings
Time A
2s
Settings
Time B
2s
hydro wizard
®
B:
Vernetzung
Sync
Modus
Wave
Settings
Current A
100%
Settings
Current B
1%
Settings
Time A
2s
Settings
Time B
2s
Settings
Phase delay
2s
If several hydro wizard® are connected in wave mode with a
phase delay it is important that the sum of time A, time B, time A-
B, and time B-A are equal. The individual values can be changed
as long as this rule is followed.
A
B
Содержание hydro wizard ECM75
Страница 1: ...hydro wizard ECM75 User Manual...
Страница 34: ...34 Installation examples Figure shows accessories 428941 429430 428943 222651 223020 428782 428944 428960...
Страница 36: ...36 Dimensions All dimensions in mm Mount dimensions...
Страница 37: ...37 Dimensions Powerbox...
Страница 40: ...Enjoy your new hydro wizard...