WSN Gateway Hardware Installation Manual
-
21
-
Activity
Steps
6. Remove adhesive covers from the Command Strips on the back of
the WSN Gateway.
7. Mount the WSN Gateway onto cleaned surface (i.e. top of server
cabinet). Press firmly for 30 seconds.
8. Secure and route AC Power Adapter wire and Ethernet Cable
using adhesive Cable Clips.
9. Repeat previous steps for remaining WSN Gateways to be
installed.
10. When all WSN Gateways are installed, proceed to the
section.
Install Gate-
way (Gate-
NOTE
: Screws and other associated hardware for mounting the Gate-