© Panduit Corp. 2018
OPERATION MANUAL
PES400
ENGLISH
PES400: PA28981A01_01
Page: 44 of 46
4-2018
8. CLEANING AND MAINTENANCE SCHEDULE FOR PES400
The following components should be cleaned and lubricated on a monthly basis assuming a
standard factory environment running a single 8-hour shift. If the working environment contains a
large amount of fine particulate dust, or extended working hours we recommend a more frequent
cleaning schedule (Bi-Weekly to Weekly). As with all servicing and maintenance, the PES400
needs to be powered off during this process. Also, oiling components that contain metal to metal
activity will not yield harmful result to operation or warranty. Specifically, for the items called out
below please use the following recommendations:
X & Y Axis Guides
Grease
Clamp
Grease
Strikers (Hammers) Grease
Punch Lever System Grease
Feeder Pushers
Oil
Characters
Oil
Machine Sensors
Alcohol Swab/Wipe
Panduit Part no.
Grease
SPEC. ISOFLEX NBU 15
PE TUBE 50GR
Oil
Siraoil (Machine Oil)