31
Run the Schedule
After the schedule times have been set
(per above instructions)
, you
will use the
Run Schedule
function whenever you want the schedule
to take effect.
There are two methods for running the schedule, either from a
slideshow or from the
CALENDAR/CLOCK
screen.
CAUTION
: After you select the
Run Schedule
function, any user
intervention will cancel the activation
(i.e., pressing
remote or control button, powering off)
and the schedule
will not take effect until you select this function again to
re-activate.
Run Schedule from Slideshow
1. Start a slideshow and press
ENTER
to select the
Run Schedule
button when it appears in the lower left corner of the screen
(approx 10 sec)
.
2. To run the schedule when the
Run Schedule
button is no longer
displayed, restart your slideshow and then press
ENTER
to select
the
Run Schedule
button when it appears.
3. The DPF will go into stand-by mode according to the schedule,
and when it resumes operation, the slideshow will again begin
to play.
Run Schedule from CALENDAR/CLOCK Screen
1. On
the
CALENDAR/CLOCK
screen, press
MENU
.
2. Select
Run Schedule
.
3. The DPF will go into stand-by mode according to the schedule,
and when it resumes operation, the
Calendar/Clock
screen will
again be displayed.
A small timer clock will appear indicating the schedule is active,
and then the DPF will operate according to the set schedule.