46
SEP 2004
Ver. 1.2
DP-1520P/1820P/1820E
(10) Remove 2
Bushings
(698).
(11) Remove
Roller Holder
(2026) Assembly.
Note:
When reinstalling, make sure that the
Roller
Holder
(2026) Assembly is properly placed on the
ADF Unit.
(12) Remove the
Paper Feed Shaft Assembly
(2029).
(13) Remove
Paper Feed Roller
(2001) and
D26 D
Gear
(2025).
(14) Remove the
Pre Feed Roller
(2018),
Pre Feed
Shaft
(2019) and
Pre Feed Gear 1
and
2
(2020,
2021).
(15) Remove 2
Silver Screws
(B1).
(16) Lift cover and release the
Latch Hook
then
remove the
ADF Rear Cover
(1701).
Содержание Workio DP-1520P
Страница 98: ...98 SEP 2004 Ver 1 2 DP 1520P 1820P 1820E DETAIL A 28 35 31 32 33 34 30 29 ...
Страница 464: ...464 SEP 2004 Ver 1 2 DP 1520P 1820P 1820E memo ...
Страница 465: ...88 Panasonic Software Operating Instructions Network Firmware Update Tool Service Tool Version 3 DZSD001829 9 ...
Страница 480: ...Panasonic Software Operating Instructions Local Firmware Update Tool Service Tool Version 3 DZSD000965 14 ...
Страница 491: ...Local Firmware Update Tool Parallel USB Port 5b4 Firmware Code File selection is completed Click Next Page 12 ...
Страница 495: ...memo ...
Страница 496: ...DZZSM00257 ...