392
SEP 2004
Ver. 1.2
DP-1520P/1820P/1820E
(41) Install 3
Clamps
(DZJK000068) and 1 Black
Clamp
(DZJK000004).
(42) Connect one end of the
RLB Harness
to CN171
on the RLB PC Board.
(43) Connect other end of the
RLB Harness
to CN2
on the PS PC Board.
(44) Secure the
RLB Harness
with the Harness
Clamp.
(45) Mount the
Heater
onto the Heater Bracket.
(46) Install 3
Clamps
(DZJK000023).
Содержание Workio DP-1520P
Страница 98: ...98 SEP 2004 Ver 1 2 DP 1520P 1820P 1820E DETAIL A 28 35 31 32 33 34 30 29 ...
Страница 464: ...464 SEP 2004 Ver 1 2 DP 1520P 1820P 1820E memo ...
Страница 465: ...88 Panasonic Software Operating Instructions Network Firmware Update Tool Service Tool Version 3 DZSD001829 9 ...
Страница 480: ...Panasonic Software Operating Instructions Local Firmware Update Tool Service Tool Version 3 DZSD000965 14 ...
Страница 491: ...Local Firmware Update Tool Parallel USB Port 5b4 Firmware Code File selection is completed Click Next Page 12 ...
Страница 495: ...memo ...
Страница 496: ...DZZSM00257 ...