409
SEP 2004
Ver. 1.2
DP-1520P/1820P/1820E
(20) Cut the
Protective Tab
on the Front Cover 1.
(21) Proceed with the installation of other options.
If finished, reinstall all Harnesses and Covers.
(22) Plug the
AC Power Cord
and turn the Power
Switch on the Right Side of the machine to the
ON position.
(23) Reconnect the
Telephone Line Cable
if it was
disconnected.
Содержание Workio DP-1520P
Страница 98: ...98 SEP 2004 Ver 1 2 DP 1520P 1820P 1820E DETAIL A 28 35 31 32 33 34 30 29 ...
Страница 464: ...464 SEP 2004 Ver 1 2 DP 1520P 1820P 1820E memo ...
Страница 465: ...88 Panasonic Software Operating Instructions Network Firmware Update Tool Service Tool Version 3 DZSD001829 9 ...
Страница 480: ...Panasonic Software Operating Instructions Local Firmware Update Tool Service Tool Version 3 DZSD000965 14 ...
Страница 491: ...Local Firmware Update Tool Parallel USB Port 5b4 Firmware Code File selection is completed Click Next Page 12 ...
Страница 495: ...memo ...
Страница 496: ...DZZSM00257 ...