36
11.4 Outdoor
Unit
11.4.1 INSTALL THE OUTDOOR UNIT
After selecting the best location, start installation
according to Indoor/Outdoor Unit Installation
Diagram.
1 Fix the unit on concrete or rigid frame firmly
and horizontally by bolt nut (ø10 mm).
2 When installing at roof, please consider strong
wind and earthquake. Please fasten the
installation stand firmly with bolt or nails.
11.4.2 CONNECTING THE PIPING
Piping size (Torque)
Model
Gas Liquid
WH-S*03/05*
WH-U*03/05*
ø12.7mm (1/2”)
[55 N•m]
ø6.35mm (1/4”)
[18 N•m]
Connecting The Piping To Outdoor Unit
Decide piping length and then cut by using pipe cutter.
Remove burrs from cut edge. Make flare after
inserting the flare nut (locate at valve) onto the copper
pipe.
Align center of piping to valves and then tighten with
torque wrench to the specified torque as stated in the
table.
CUTTING AND FLARING THE PIPING
1 Please cut using pipe cutter and then remove the burrs.
2 Remove the burrs by using reamer. If burrs is not removed, gas leakage may be caused.
Turn the piping end down to avoid the metal powder entering the pipe.
3 Please make flare after inserting the flare nut onto the copper pipes.
Содержание WH-SDC03E3E5 Series
Страница 12: ...12 4 Location of Controls and Components 4 1 Indoor Unit 4 1 1 Location of Control ...
Страница 13: ...13 ...
Страница 14: ...14 ...
Страница 15: ...15 4 1 2 Weekly Timer Setting ...
Страница 16: ...16 4 1 3 Setting Up the Special Functions ...
Страница 17: ...17 4 1 4 Main Components 4 2 Outdoor Unit ...
Страница 18: ...18 5 Dimensions 5 1 Indoor Unit ...
Страница 19: ...19 5 2 Outdoor Unit ...
Страница 21: ...21 ...
Страница 22: ...22 7 Block Diagram ...
Страница 23: ...23 8 Wiring Connection Diagram 8 1 Indoor Unit ...
Страница 24: ...24 8 2 Outdoor Unit ...
Страница 25: ...25 9 Electronic Circuit Diagram 9 1 Indoor Unit ...
Страница 26: ...26 9 2 Outdoor Unit ...
Страница 27: ...27 10 Printed Circuit Board 10 1 Indoor Unit 10 1 1 Main Printed Circuit Board ...
Страница 28: ...28 10 1 2 Solar Printed Circuit Board Optional ...
Страница 29: ...29 10 2 Outdoor Unit 10 2 1 Main Printed Circuit Board ...
Страница 43: ...43 ...
Страница 49: ...49 ...
Страница 50: ...50 ...
Страница 60: ...60 ...
Страница 110: ...110 17 3 To Remove Pressure Gauge 17 4 To Remove Control Panel ...
Страница 111: ...111 17 5 To Remove RCCB 17 6 To Remove Transformer and Electronic Controller Board ...
Страница 123: ...123 18 4 Hydraulic Pump Performance ...