5.3 Periodic Inspection
● According to the periodic inspection frequency as specified in ISO 14119, inspect the
following items and verify that there are no abnormalities. Operating this device without
performing the inspection or without removing the abnormal condition may cause death
or serious injury.
■
Inspection frequency
SIL3 / PLe: At least once a month, SIL2 / PLd: At least once a year
Checklist (periodic inspection)
Check
column
Inspection item
□
The structure of the machine does not prevent any safety mechanisms from causing the
machine to stop or to make an emergency stop.
□
No modification has been made in the machine control system that obstructs the safety
mechanisms.
□
There is no change in the installation environment of the switch body, the actuator and the door
where they are mounted.
□
Check each door to confirm that the machine stops when the door opens.
□
No screws or connectors related to the device are loose.
5.3 Periodic Inspection
5-4
WUME-SGPUM-2
Содержание SG-P Series
Страница 2: ... MEMO 2 WUME SGPUM 2 ...
Страница 4: ... MEMO iv WUME SGPUM 2 ...
Страница 16: ... MEMO 1 10 WUME SGPUM 2 ...
Страница 31: ... Actuator 3 1 Installation Conditions WUME SGPUM 2 3 5 ...
Страница 40: ... MEMO 3 14 WUME SGPUM 2 ...
Страница 54: ... MEMO 5 6 WUME SGPUM 2 ...
Страница 55: ...6 Troubleshooting 6 1 Troubleshooting 6 2 WUME SGPUM 2 6 1 ...
Страница 65: ...7 2 Dimensions WUME SGPUM 2 7 7 ...
Страница 67: ...7 2 Dimensions WUME SGPUM 2 7 9 ...
Страница 68: ...7 2 3 I O Circuits PNP output 7 2 Dimensions 7 10 WUME SGPUM 2 ...
Страница 69: ... NPN output 7 2 Dimensions WUME SGPUM 2 7 11 ...
Страница 70: ... MEMO 7 12 WUME SGPUM 2 ...
Страница 71: ...8 Appendix 8 1 CE Marking Declaration Conformity 8 2 WUME SGPUM 2 8 1 ...
Страница 75: ... MEMO WUME SGPUM 2 ...