
4. Installation of Mechanism Chassis and Cassette Up Ass’y onto
Main C.B.A.
A. Make sure the Mode Select SW. on the Main C.B.A. is in EJECT
position. If not, rotate the Mode Select SW. until the alignment
projection is in the EJECT Position.
Fig. D8
B. Make sure the phase hole of the Main Cam Gear on the bottom
side of the Mechanism Unit is in EJECT Position.
Fig. D9
31
Содержание PVDF204 - DVD/VCR/TV COM
Страница 11: ...Fig 1 5 11 ...
Страница 12: ...Fig 1 6 12 ...
Страница 25: ...Fig D2 25 ...
Страница 26: ...Fig D3 26 ...
Страница 27: ...Fig D4 27 ...
Страница 28: ...6 1 1 1 Notes in chart 1 Removal of VCR DVD Ass y Fig D5 28 ...
Страница 48: ...7 4 TEST POINTS AND CONTROL LOCATION 48 ...
Страница 51: ...11 2 DVD SECTION 51 ...
Страница 52: ...11 3 CHASSIS FRAME SECTION 1 Model A B C D E F 52 ...
Страница 53: ...11 4 CHASSIS FRAME SECTION 2 53 ...
Страница 54: ...11 5 CHASSIS FRAME SECTION 3 54 ...
Страница 55: ...11 6 PACKING PARTS AND ACCESORIES SECTION 55 ...
Страница 71: ...R6006 ERJ6GEYJ102V MGF CHIP 1 10W 1K 71 ...