8
IMPORTANT! . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Please Read Before Starting
Check of Density Limit
Precautions for Installation Using New Refrigerant
Important Information Regarding The Refrigerant Used
High-Durable model
1. GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
1-1. Tools Required for Installation (not supplied)
1-2. Accessories Supplied with Outdoor Unit
1-3. Type of Copper Tube and Insulation Material
1-4. Additional Materials Required for Installation
1-5. Tubing Length
1-6. Tubing Size
1-7. Straight Equivalent Length of Joints
1-8. Additional Refrigerant Charge
1-9. System Limitations
1-10. Check of Limit Density
1-11. Installing Distribution Joint
1-12. Optional Distribution Joint Kits
1-13. Example of Tubing Size Selection and Refrigerant
Charge Amount
2. SELECTING THE INSTALLATION SITE . . . . . . . . . . . . . 18
2-1. Outdoor Unit
2-2. Air-Discharge Chamber for Top Discharge
2-3. Installing the Outdoor Unit in Heavy Snow Areas
2-4. Precautions for Installation in Heavy Snow Areas
2-5. Dimensions of Air-Discharge Chamber
2-6. Dimensions of Air-Discharge Chamber for Top
Discharge
2-7. Dimensions of Snow-Proof Vents
3. HOW TO INSTALL THE OUTDOOR UNIT . . . . . . . . . . . . 23
3-1. Installing the Outdoor Unit
3-2. Drainage Work
3-3. Routing the Tubing and Wiring
4. ELECTRICAL WIRING . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
4-1. General Precautions on Wiring
4-2. Recommended Wire Length and Wire Diameter for
Power Supply System
4-3. Wiring System Diagram
5. HOW TO PROCESS TUBING . . . . . . . . . . . . . . . . . . . . . 34
5-1. Connecting the Refrigerant Tubing
5-2. Connecting Tubing Between Indoor and Outdoor
Units
5-3. Insulating the Refrigerant Tubing
5-4. Taping the Tubes
5-5. Finishing the Installation
6. AIR PURGING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
■
Air Purging with a Vacuum Pump (for Test Run) Preparation
7. TEST RUN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42
7-1. Preparing for Test Run
7-2. Test Run Procedure
7-3. Main Outdoor Unit P.C. Board Setting
7-4. Auto Address Setting
7-5. Setting Test Run Remote Controller
7-6. Caution for Pump Down
7-7. Self-Diagnosis Function Table and Contents of Alarm
Display
CONTENTS
Page
Page
00_291827_2WAY_Eng.indb 8
2017/7/5 13:41:24