5.
Install the CS temporarily for the site survey. Install the CS at least 2 m above the floor, and place the
antennas so that they are pointing in directions that are 90 degrees apart (for antenna diversity), as follows:
Note
The illustration of the CS is based on the KX-TDA0158.
At least 2 m
45º
45º
90º
Quick Installation Guide
21
4 Before Site Survey