4. Finish the site survey
Refer to "6 After Site Survey".
a.
Turn off the PS.
b.
Stop supplying power, and return all DIP switches of each CS to the OFF position.
5. Connect the CS and PS to the PBX and test the operation
Refer to "7 Connecting a Cell Station to the PBX".
a.
Connect the CSs to the PBX.
b.
Register the PSs to the PBX.
c.
Walk around the service area while having a conversation using a registered PS. If noise is frequent or
conversations disconnect, relocate the CSs or install an additional CS.
6. Mount the CS on the wall
Refer to "8 Wall Mounting".
a.
If there are no problems in testing, mount the CS on the wall.
12
Quick Installation Guide
2 Procedure Overview