TEST AND MEASUREMENT
Issue 1
Section 6
MCUK010801C8
Revision 0
– 34 –
Service Manual
Figure 6.8: PC Screen (SCRN10)
3.
Press ENTER on the PC keyboard.
4.
At the PC press Shift F10.
5.
After approximately 1 second, set the ExtPwr switch to ON until the unit powers up.
The back light will be illuminated and all LEDs will be lit.
Go to Section 6.5 (Channel Box Test Commands) for further testing information.
6.4.3.
Power On in Normal Mode
1.
Connect the test equipment as shown in Section 6.3.
Figure 6.9: External Test Equipment Setup
2.
Ensure that the following settings are made:
NOTE:
The Display will read:
GET STATION
ADDRESS
= __
INFO
= __
a)
Interface Box
IFB003 or IFB004
Power
DOWN position
IGN
UP position
MODE
UP position
b)
Power Supply IFB003 or IFB004
+12V DC
ON
MODE
UP position
c)
PC
INTERF
AC
E BO
X
M
CUK
PO
W
ER
PH
O
N
E
C
O
M
PU
TE
R
N
O
O
U
TP
U
T 1
2V
D
C
O
U
TP
U
T
O
FF
O
N
ABC
DEF
GHI
JKL
TUV
+
WXYZ
MNO
PQRS
DEF
10492-1
TO GSM TEST SET
Содержание EB-GD95
Страница 4: ...Issue 1 Section MCUK010801C8 Revision 0 iv Service Manual This page is left intentionally blank ...
Страница 64: ...LAYOUT DIAGRAMS MCUK010801C8 Section 9 Issue 1 Service Manual 60 Revision 0 D C E A B F 3 4 ...
Страница 65: ...MCUK010801C8 Section 9 Service Manual 57 9 CIRCUIT DIAGRAMS Figure 9 1 GD95 C A4 A4 EB GD95 EB GD95C ...
Страница 66: ...CIRCUIT DIAGRAMS on 9 Issue 1 Revision 0 GD95 Circuit Diagram Logic A4 A4 ...
Страница 67: ...CIRCUIT DIAGRAMS Issue 1 Section 9 Revision 0 58 Figure 9 2 GD95 Cir A4 A4 ...
Страница 68: ...9 MCUK010801C8 Service Manual GD95 Circuit Diagram RF A4 A4 EB GD95 EBGD95C ...