TEST AND MEASUREMENT
Issue 1
Section 6
MCUK010801C8
Revision 0
– 32 –
Service Manual
6.4.
Complete Unit Setup
6.4.1
Connection Diagrams
Figure 6.6: Test Connection Diagrams
IMPORTANT NOTE
To allow accurate measurement of the complete unit the test equipment must be connected as shown. The PCB Test Setup
must be used to enable repair to PCBs. Once repair / replacement is complete, the assembled unit must be tested and
calibrated using the Complete Unit Test Setup.
+12V POWER SUPPLY
INTERFACE BOX
PC
RS232
PCB REPAIR JIG
GSM TESTER
RF CABLE
+12V POWER SUPPLY
INTERFACE BOX
PC
RS232
GSM TESTER
RF CABLE
UNIT UNDER TEST
RF ADAPTOR
PCB TEST SETUP
COMPLETE UNIT TEST SETUP
10491-1
Содержание EB-GD95
Страница 4: ...Issue 1 Section MCUK010801C8 Revision 0 iv Service Manual This page is left intentionally blank ...
Страница 64: ...LAYOUT DIAGRAMS MCUK010801C8 Section 9 Issue 1 Service Manual 60 Revision 0 D C E A B F 3 4 ...
Страница 65: ...MCUK010801C8 Section 9 Service Manual 57 9 CIRCUIT DIAGRAMS Figure 9 1 GD95 C A4 A4 EB GD95 EB GD95C ...
Страница 66: ...CIRCUIT DIAGRAMS on 9 Issue 1 Revision 0 GD95 Circuit Diagram Logic A4 A4 ...
Страница 67: ...CIRCUIT DIAGRAMS Issue 1 Section 9 Revision 0 58 Figure 9 2 GD95 Cir A4 A4 ...
Страница 68: ...9 MCUK010801C8 Service Manual GD95 Circuit Diagram RF A4 A4 EB GD95 EBGD95C ...