TEST AND MEASUREMENT
Issue 1
Section 6
MCUK001002C8
Revision 0
– 38 –
Service Manual
b.
Power supply
+12V DC: ON
c.
PC
Channel box software loaded and the screen indicating as shown:
Figure 6.9: PC Screen (SCRN10)
3.
Press ENTER on the PC keyboard.
4.
At the PC press F10.
5.
After approximately 1 second, set the Interface Cable switch to ON (position is marked by a dot).
NOTE:
The display will read:
GET STATION
ADDRESS = _ _
INFO = _ _
The back light will be illuminated and all LEDs will be lit.
Go to Section 6.5 (Channel Box Test Commands) for further testing information.
Power On In Normal Mode
1.
Connect the test equipment as shown in the diagram.
Figure 6.10: External test equipment setup
2.
Ensure that the following settings are made:
a.
Interface box IFB003 or IFB004
Power:
DOWN position
IGN:
UP position
MODE:
UP position
b.
Power supply:
+12V DC:ON
c.
PC
Channel box software loaded and the screen indicating as shown:
IN
TER
FA
CE B
OX
M
CUK
PO
W
ER
PH
O
N
E
C
O
M
PU
TE
R
N
O
O
U
TP
U
T 1
2V
D
C
O
U
TP
U
T
O
FF
O
N
ABC
DEF
GHI
JKL
TUV
+
WXYZ
MNO
PQRS
10238-1
TO GSM TEST SET
Содержание EB-GD93
Страница 4: ...Issue 1 iv MCUK001002C8 Revision 0 Service Manual This page is left intentionally blank ...
Страница 6: ...Issue 1 Section MCUK001002C8 Revision 0 vi Service Manual This page is left intentionally blank ...
Страница 73: ... 5 8 7 5 06 0 8 6HFWLRQ VVXH 6HUYLFH 0DQXDO 5HYLVLRQ 5 8 7 5 06 0DLQ 3 RJLF ...
Страница 74: ... 5 8 7 5 06 0 8 6HFWLRQ VVXH 6HUYLFH 0DQXDO 5HYLVLRQ 0DLQ 3 5 6KHHW RI C A B ...
Страница 75: ... 5 8 7 5 06 0 8 6HFWLRQ VVXH 6HUYLFH 0DQXDO 5HYLVLRQ 0DLQ 3 5 6KHHW RI C A B ...
Страница 76: ...CIRCUIT DIAGRAMS MCUK001002C8 Section 8 Issue 1 Service Manual 71 Revision 0 8 4 Keypad PCB ...
Страница 77: ......
Страница 78: ... 287 5 06 0 8 6HFWLRQ VVXH 6HUYLFH 0DQXDO 5HYLVLRQ 287 5 06 0DLQ 3 A B C D E F 1 2 3 4 ...
Страница 79: ... 287 5 06 VVXH 6HFWLRQ 0 8 5HYLVLRQ 6HUYLFH 0DQXDO H SDG 3 A B C D 1 2 3 4 5 ...