13
Preparation/Basic
(ENG) SQT0999
The battery that can be used with this unit is DMW-BLC12E or DMW-BLC12.
1
Attach the battery paying attention to the direction of the battery.
2
Connect the AC cable.
• The [CHARGE] indicator
A
lights up and charging begins.
∫
About the [CHARGE] indicator
• When the [CHARGE] indicator flashes
– The battery temperature is too high or too low. It is recommended to charge the battery again
in an ambient temperature of between 10
o
C and 30
o
C.
– The terminals of the charger or the battery are dirty. In this case, wipe them with a dry cloth.
∫
Charging time
• The indicated charging time is for when the battery has been discharged completely.
The charging time may vary depending on how the battery has been used.
The charging time for the battery in hot/cold environments or a battery that has not been
used for a long time may be longer than normal.
Charging the Battery
On:
Charging.
Off:
Charging has completed.
(Disconnect the charger from the electrical socket and detach the
battery after charging is completed.)
Charging time
Approx. 140 min
DMC-G7W_SG-SQT0999_eng.book 13 ページ 2015年7月8日 水曜日 午前8時27分