19
3. For the embedded piping
Install accessory of tube ass’y
1. Remove chassis back particular piece.
2. Connect tube ass’y to gas side piping. Liquid side
piping need to pull out to joint tube ass’y.
3. Set the piping direction.
(For bottom piping, need to perform cutting and flaring
process.)
4. Use 2 spanner to tighten the nut. (tighten torque 65 N
●
m)
5. Check gas leakage at joint area.
6. Cover the open tubing with the foam and bind it by
band
.
7. Close back the chassis back piece.
Содержание CS-V28EKE CU-V28EKE
Страница 8: ...8 4 Location of Controls and Components Indoor Unit Outdoor Unit Remote Control ...
Страница 9: ...9 5 Dimensions 5 1 Indoor Unit Remote Control ...
Страница 10: ...10 5 2 Outdoor Unit ...
Страница 11: ...11 6 Refrigeration Cycle Diagram ...
Страница 12: ...12 7 Block Diagram ...
Страница 13: ...13 8 Wiring Connection Diagram ...
Страница 14: ...14 9 Printed Circuit Board 9 1 Indoor Unit BOTTOM VIEW ...
Страница 15: ...15 TOP VIEW ...
Страница 16: ...16 9 2 Indicator And Receiver BOTTOM VIEW TOP VIEW ...
Страница 20: ...20 This can be used for left rear piping and left bottom piping also ...
Страница 43: ...43 15 Technical Data 15 1 Thermostat Characteristics ...
Страница 45: ...45 15 3 Operation Characteristics 15 3 1 CS V28EKE CU V28EKE ...
Страница 46: ...46 ...