2
3
Preparation Before Operation
Before operating the unit
■
Open the front panel.
■
Remove air filter.
■
Insert air purifying filter.
Insert the air filters.
Hold the tab to raise up
slightly and then pull down.
Hold the panel openers at both
sides and pull up the front panel.
Air
filter
■
Connect the power
supply cord to an
independent power
supply.
1
Air purifying
filter
Be careful not to
hurt your hands by
metal parts.
<Note>
Use under the following conditions :
(Unit in °C)
DBT : Dry Bulb Temperature
WBT : Wet Bulb Temperature
Maximum Temperature
Minimum Temperature
Cooling
Indoor Outdoor
DBT
WBT
DBT
WBT
32
23
43
26
16 11 16 11
Heating
Indoor
Outdoor
DBT
WBT
DBT
WBT
30
_
24
18
16 _
27
-5
-6
CS-A28
BKP5/CU-A28BKP5
Содержание CS-A28BKP5
Страница 8: ...4 Dimensions 8 CS A28BKP5 CU A28BKP5 CS A28BKP5 CU A28BKP5 ...
Страница 10: ...6 Block Diagram 10 CS A28BKP5 CU A28BKP5 CS A28BKP5 CU A28BKP5 ...
Страница 11: ...7 Wiring Diagram 11 CS A28BKP5 CU A28BKP5 CS A28BKP5 CU A28BKP5 ...
Страница 15: ...Soft Dry Operation Time Diagram 15 CS A28BKP5 CU A28BKP5 ...
Страница 46: ... This can be used for left rear piping and left bottom piping also 46 CS A28BKP5 CU A28BKP5 ...
Страница 64: ...14 Technical Data 64 CS A28BKP5 CS A28BKP5 CU A28BKP5 ...
Страница 65: ...65 CS A28BKP5 CU A28BKP5 CS A28BKP5 CU A28BKP5 ...
Страница 66: ...66 CS A28BKP5 CU A28BKP5 CS A28BKP5 CU A28BKP5 ...
Страница 67: ...15 Exploded View 67 CS A28BKP5 CS A28BKP5 CU A28BKP5 ...
Страница 69: ...17 ExplodedView 69 CU A28BKP5 CS A28BKP5 CU A28BKP5 ...
Страница 72: ...20 Electronic Circuit Diagram CS A28BKP5 CU A28BKP5 SCHEMATIC DIAGRAM 1 3 72 CS A28BKP5 CU A28BKP5 ...
Страница 73: ...SCHEMATIC DIAGRAM 2 3 73 CS A28BKP5 CU A28BKP5 ...
Страница 74: ...SCHEMATIC DIAGRAM 3 3 74 CS A28BKP5 CU A28BKP5 ...
Страница 75: ...75 CS A28BKP5 CU A28BKP5 ...
Страница 77: ...20 1 REMOTE CONTROL 77 Printed in Taiwan CS A28BKP5 CU A28BKP5 ...