8 – 65
Aquarea air/water heat pump – Installation manual for monobloc and split systems C, D and E series 05 / 2014
8
Electrical
ins
tallation
Electrical installation
Connections
Split systems: Electrical connection between hydro module and outdoor unit
➤
Wrap cable tape around the pipes and cables as shown in the figure
and secure using clamps if necessary .
Alternatively, you can lay the pipelines and cables in a cable duct .
➤
After laying all pipes and cables, seal the wall penetration into the
building with suitable sealant (to be provided by the customer) .
1
Cable tape or cable duct
2
Clamp
3
Connection cable between hy-
dro module and outdoor unit
4
Liquid refrigerant pipe
5
Gaseous refrigerant pipe
6
Outdoor unit
1
6
2
3
4
5