![Panametrics C-ET Скачать руководство пользователя страница 32](http://html1.mh-extra.com/html/panametrics/c-et/c-et_installation-manual_3403828032.webp)
24
Model C-ET Installation Guide
1.3.3.5
Mounting the Transducers (cont.)
Before the C-ET transducer can be permanently inserted into the clamp, solid sheet couplant must be applied. To do
this, lay the solid sheet couplant over the transducer face and bend the ends over the transducer’s heel and toe.
Temporarily secure the couplant to the heel and toe with electrician’s tape. Do not apply the tape to the pipe contact
surface. Tape will burn/fall off after time.
Figure 9: Applying the Solid Sheet Couplant
8.
Install the sensors into the yokes taking care not to shift the couplant. Tighten the hold down bolts to 15 ft-lbs,
20 N-m. Tighten the backing nut.
9.
Reinstall the insulation up to the line engraved on the sensors.
CAUTION!
Not reinstalling the insulation up to the engraved line could cause permanent damage to the C-RS
transducer.
You have completed installing the V clamping fixture and transducers. You should do all of the following:
• Refer to the installation section of your
User’s Manual
or
Startup Guide
to make transducer connections.
• Make a note of the installation date and set a schedule for periodic inspection and tightening of clamping
fixture nuts to ensure the clamping fixture does not become loose and fall, possibly causing injury.
• Once the flowmeter is up and running, measure the signal strength upstream and downstream using the
flowmeter’s diagnostics menu and make a note of it. This value will be helpful when making periodic checks.
Refer to your
User’s Manual
or
Startup Guide
for more details.
Toe
Heel
Solid Sheet Couplant
Содержание C-ET
Страница 2: ......
Страница 4: ...ii no content intended for this page...
Страница 6: ...Contents iv Model C ET Installation Guide...
Страница 48: ...Warranty 40 Model C ET Installation Guide no content intended for this page...
Страница 49: ......