
BWT™ System Installation Guide
17
Chapter 2. Standard Installation (FTPA Buffers)
2.5.1
Installing and Orienting the Junction Box
Before placing the BWT transducer into the FTPA buffer permanently, you must make sure the junction box will be
properly oriented after it is installed.
1.
Screw the transducer into the junction box as shown below.
2.
Screw the transducer/junction box assembly into the FTPA Buffer.
3.
Check the junction box orientation. The junction box cover should be at a downward angle so that any liquid can
drain out of the box. If necessary, adjust the junction box until the cover is angled downward.
4.
Remove the transducer/junction box assembly.
5.
Repeat the above steps for the other transducer.
OK
Good
Bad
Содержание BWT System
Страница 1: ...panametrics com Flow 916 058 F July 2021 BWT System Installation Guide ...
Страница 2: ......
Страница 4: ...ii no content intended for this page ...
Страница 8: ...Contents BWT System Installation Guide ...
Страница 16: ...Chapter 1 General Information 8 BWT System Installation Guide no content intended for this page ...
Страница 52: ...Chapter 5 Specifications 44 BWT System Installation Guide no content intended for this page ...
Страница 54: ...46 BWT System Installation Guide no content intended for this page ...
Страница 57: ......