background image

© Pan Acoustics GmbH   

 V 1.0    

Page 6 of 7

Assembly Manual                                                                                   

TWM III

6. Transport and storage

The product is to be transported with care to prevent any damage that would impair its function.

The product is designed for both indoor and outdoor applications. Prolonged storage in liquids, e.g. 

water, is to be avoided.

Install  the  pre-mounted  mount 

(loudspeaker)  (C)  into  mount 

(wall) (D).

Check all screw connections for fi rm fi t and friction locking. The individual assemblies are to be 

checked to ensure that they are form fi tting, and screw connections are to be re-tightened where 

appropriate.

5. Maintenance and care

The speaker accessory may show signs of wear over time, e.g. due to mechanical loads, corrosion or 

improper handling. Therefore, for permanent installations, check the mount at regular intervals for 

signs of wear and fi rm fi t.

When  performing  inspections,  it  is  particularly  important  to  watch  out  for  deformations,  cracks, 

notches, damage on threads and corrosion. Mounting and fastening materials such as screws and 

tensioning straps also need to be checked thoroughly for wear or deformation.

If the check reveals uncertainties or damaged parts, the speaker/mount may no longer be used. The 

operator/user is required to be familiar with country-specifi c comprehensive testing regulations and 

to apply them. 

Fasten  bracket  (wall)  (E)  using 

two  screw  fi xings  suitable  for 

wall mounting.

Install  the  axle  (F)  with  the 

pre-mounted  screw  connection 

(G+H) into holder (wall) (E).

Connect  the  Axle  (F)  with 

screw  (I)  and  washer  (J)  with 

the  mount  (wall)  (D)  on  top 

and bottom.

Push  the  caps  (K)  onto  the 

screw connection.

Содержание TWM III

Страница 1: ...0 95 70 Email contact pan acoustics de www pan acoustics de OPERATING MANUAL ASSEMBLY MANUAL for PB 04 PB 08 PB 16 PB 24 PB 32 PB 40 P 04 Pi P 08 Pi P 16 Pi Wall Mount TWM III Read the operating manua...

Страница 2: ...ion and connection of the TWM III for Pan Beam and Pan Speaker systems It is geared towards systems technicians and persons assigned the task of installing and operating the system Technical speci cat...

Страница 3: ...amage has not been delivered completely has been stored under adverse conditions for a prolonged period has been improperly shipped e g unsuitable packaging If the product shows signs of impairments t...

Страница 4: ...a visual inspection of the speaker and the accessory is to be performed prior to each use assembly If there are signs of wear cracking or deformation they are to be replaced without delay The visual...

Страница 5: ...speaker C onto the mounted slot nut A using 2 screws D Improperly selected fastening material for wall or ceiling assembly may cause the speaker to fall down Prior to assembly it is necessary to check...

Страница 6: ...ion or improper handling Therefore for permanent installations check the mount at regular intervals for signs of wear and rm t When performing inspections it is particularly important to watch out for...

Страница 7: ...posed of according to existing national regulations Please undertake to ensure that the product cannot be re used or used for any other purpose after disposal 9 Contact address Pan Acoustics GmbH Lind...

Отзывы: