70
004779194 - 14/03/2023
8 FIRST IGNITION
The first ignition must be carried out
by the installer.
8.1 Pellet loading
The pellets must be loaded from a door which
must be provided in the hood of the cladding
and connected to the appliance through the
appropriate accessories (optional), carefully fol-
lowing the assembly instructions.
Do not use the extraction system of the
appliance as a means to load the pellet
hopper.
The use of non-original accessories is
not recommended.
Pellets falling outside the hopper may
damage the operation of the appliance
and cause fires.
The pipe for pellet loading (optional) must act
exclusively as a ramp to fill the hopper of the
appliance and not as an extension of the hopper
itself; avoid loading more pellets than the hopper
can hold.
8.1.1 Optionals available
• Loading system with flexible metal pipe and
loading door (
Fig. 41
).
• Stand kit (
Fig. 42
).
• Finishing frames for plasterboard (
Fig. 43
).
• Combustion air ducting kit (
Fig. 44
)).
Fig. 41
Fig. 42
Fig. 43
Fig. 44
Содержание V15
Страница 42: ...42 004779194 14 03 2023 57 5 1 58 59 59 59 59 60 62 63 64 64 64 66 66 67 68 70 70 71 72 72 72 73 74 75 78...
Страница 193: ...ITALIANO ENGLISH FRAN AIS 004779194 14 03 2023 193 DEUTSCH ESPA OL...
Страница 194: ...194 004779194 14 03 2023...
Страница 195: ...ITALIANO ENGLISH FRAN AIS 004779194 14 03 2023 195 DEUTSCH ESPA OL...