background image

19

PZ Series 150-250-500-1000 Shaker Cleaner 

Service Notes

Date

Service Performed

Notes

Model Number _____________________________ Serial Number ______________________________

Ship Date _________________________________ Installation Date _____________________________

Filter Type ____________________________________________________________________________

Collected Dust  ________________________________________________________________________

Dust Properties:   Kst ______________Pmax _____________MIE ___________MEC ________________

Accessories __________________________________________________________________________

Other ________________________________________________________________________________

 ____________________________________________________________________________________

Product Information

(Process Owner to complete and retain for your records)

Содержание PZ Series

Страница 1: ...rate or perform maintenance on this collector until you have read and understood the instruction and warnings contained within this manual PZ Series Dust Collector PZ 150 250 500 1000 Shaker Cleaner M...

Страница 2: ...nt This manual has been supplied to assist with the installation operation and maintenance for the collector purchased Please read the manual before installing operating or performing maintenance on t...

Страница 3: ...uipment 5 Hopper and Leg Installation 5 Provisional Anchor Bolt Recommendations 6 Collector Installation 6 Electrical Wiring 8 Inlet Assembly 8 Preliminary Start Up Check 12 Maintenance Information 13...

Страница 4: ...1 Safety Communication...

Страница 5: ...eration Other options include explosion relief vents static grounding weather hoods and caster frames Purpose and Intended Use Misuse or modification of this equipment may result in personal injury Do...

Страница 6: ...et The Unimaster is an intermittent duty collector which means that cleaning starts when the fan is turned OFF and the appropriate fan run down time is complete The solid state timer automatically sta...

Страница 7: ...ollector will compromise collector performance Inspect collector to ensure all hardware is properly installed and tight prior to operating collector Installation Use proper equipment and adopt all saf...

Страница 8: ...ices must be adequately supported to prevent severe personal injury and or property damage When hazardous conditions or materials are present consult with local authorities for the proper location of...

Страница 9: ...0 to 70 Hopper and 55 Gallon Drum Base Styles 1 Prepare the foundation or support framing in the selected location Locate and install anchors 2 Lift collector into position over the anchor bolts and l...

Страница 10: ...bolts using customer supplied hardware Typical Installation PZ 500 to 1000 or Two Piece Shipment 5 Remove the lifting brackets from the top of the base assembly 6 Apply two strips of sealant or caulk...

Страница 11: ...with back inlets Contact Pakzy if additional changes are necessary 1 Remove the inlet blank from the specified location 2 Replace damaged sealant if necessary 3 Secure inlet to collector using the ha...

Страница 12: ...nergized and the shaker motor runs for approximately 30 seconds Typical Wiring Diagram Three Phase Power Supply Shaker motor contactor is de energized and the timer resumes inactive status Note Before...

Страница 13: ...10 230 Volt Single Phase Power Supply Wiring Diagram...

Страница 14: ...11 PZ Series 150 250 500 1000 Shaker Cleaner 115 Volt Single Phase Power Supply Wiring Diagram...

Страница 15: ...are properly wired and all service switches are in the OFF position 7 Check that all optional accessories are installed properly and secured 8 Turn power ON at source 9 Turn fan motor ON 1 Check all...

Страница 16: ...ipment and procedures Note the standard collector is not equipped with access platforms unless noted on the specification drawings Electrical service or maintenance work must be performed by a qualifi...

Страница 17: ...bag pockets into the shaker bar slots 6 Push the filter assembly the remaining distance into the collector and check that all pockets are firmly seated in the shaker bar 7 Lift retention handles for U...

Страница 18: ...h and low pressure ports on the side of the gauges 3 Attach the mounting bracket using three 6 32 x 1 4 in screws supplied 4 Mount the gauge and bracket assembly to the supporting structure using two...

Страница 19: ...dia bonding and grounding components are available for UMA collectors equipped with antistatic filter bags 1 If the collector is ordered with antistatic filter bags the grounding lug and internal comp...

Страница 20: ...vented equipment outside buildings and away from normally occupied areas Explosion vents should be inspected regularly to confirm physical and operational condition Replace any damaged parts immediate...

Страница 21: ...FF and allow the controller to perform several complete cleaning cycles Replace filter bags Motor speed low Check all supply voltage phase and motor connections Fan rotation backward Check and correct...

Страница 22: ...______________________ Collected Dust _________________________________________________________________________ Dust Properties Kst_______________Pmax______________MIE____________MEC_________________...

Отзывы: