7
PZ Series 150-250-500-1000 Shaker Cleaner
UMA 100 to 750 or Two-Piece Shipments
(Hopper and 55-Gallon Drum Base Styles)
1. Prepare the foundation or support framing in the
selected location. Locate and install anchors.
2. Lift base, leg, and hopper assembly into position over
the anchor bolts and lower slowly.
3. Level collector horizontally and vertically, using steel
shims under legs where required.
4. Secure collector to anchor bolts using customer-
supplied hardware.
Typical Installation,PZ 500 to 1000 or Two-Piece Shipment
5. Remove the lifting brackets from the top of the base
assembly.
6. Apply two strips of sealant or caulk to the hopper’s
top flange: one toward the inside of the bolt pattern
and one toward the outside of the bolt pattern.
7. Lift collector section into position over the base
assembly and lower slowly.
8. Use drift pins to align holes.
9. Secure with bolts, washers, and hex nuts supplied.
Tighten to form an airtight seal.
apply sealant or caulk
toward inside and
outside of bolt pattern
collector section
base, leg and
hopper assembly